My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 however, there is no bid item to cover any one or more of such removals, then in that <br /> i <br /> 2 event the removal shall be considered as incidental to the construction and costs thereof <br /> 3 shall be included in other items of the work. <br /> 4 III <br /> 5 Where the structures are removed, the voids shall be backfilled with suitable job <br /> 6 excavated material and compacted as the Engineer may direct, and such compaction I 7 work shall be considered as incidental to the removal work. <br /> 8 <br /> 9 If the Engineer determines the job-excavated material to be unsuitable for backfill and, <br /> 10 therefore, specifies or directs a backfill from another source shall be used, the payment <br /> 11 therefore will be made at the unit contract price if the same is carried in the proposal, or <br /> 12 as extra work under Section 1-04.4 if not included as an item in the proposal. <br /> 13 <br /> 14 2-02.3(3) Removal of Pavement, Sidewalks, Curbs and Gutters <br /> 15 Section 2-02.3(3) is deleted in its entirety and replaced with the following. <br /> 16 <br /> 17 ***'''F* <br /> 18 2-02.3(3) Removal of Existing Street Improvements <br /> 19 1 <br /> 20 2-02.3(3)A Description <br /> 21 The work shall consist of the removal and disposal of various existing improvements, <br /> 22 such as pavements, structures, pipe, curb, curb and gutter, gutter and other items <br /> I <br /> 23 necessary for the accomplishment of the improvement. <br /> 24 <br /> 25 <br /> I <br /> 26 2-02.3(3)C Removal of Asphalt Concrete Pavement <br /> 27 Removal of existing pavements such as asphalt concrete pavement, placed upon an <br /> 28 earth or granular subgrade located within and around the trench excavation area shall ' <br /> 29 be removed and paid for as "Remove Existing Asphalt Concrete Pavement," per Square <br /> 30 Yard. <br /> 31 <br /> I <br /> 32 Where "Remove Existing Asphalt Concrete Pavement," per square yard is being paid <br /> 33 for, cement concrete curb and gutter removal shall be considered separate from <br /> 34 pavement removal. The pavement removal shall be measured to the face of gutter. See <br /> 35 appendix for pothole investigation reports showing the pavement thicknesses. <br /> I <br /> 36 <br /> 37 2-02.3(3)D Removal of Curb, Curb and Gutter <br /> 38 Existing curbs shall be removed where shown on the plans or where encountered in the <br /> 39 work and designated by the Engineer. <br /> 40 <br /> 41 Curb and gutter to be removed may be of cement concrete, or may be a cement concrete <br /> 42 curb with a brick gutter on a cement concrete back, or may be other combinations of <br /> 43 rigid materials. In any event it is intended that the full section shall be removed. <br /> 44 I 45 2-02.3(3)E Removal of Cement Concrete Sidewalks <br /> 46 For removal purposes, all concrete slabs that average 4 inches or less in thickness shall <br /> 47 be considered as sidewalk removal. <br /> 48 <br /> 49 Cement concrete sidewalk shall be removed by sawcutting at the nearest scribe marks <br /> 50 beyond the neat line limits subject to the following requirements: <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 75 OF 117 August 2018 <br /> 111 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.