My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I1 Removal of stripes in excess of 8" in width and of irregular areas such as traffic islands, etc., <br /> 2 will be incidental with asphalt removal or traffic control implementation. <br /> 3 <br /> I 4 Removal of traffic arrows and traffic letters will be incidental with asphalt removal or traffic <br /> 5 control implementation. <br /> ' 6 <br /> 7 <br /> 8 2-02.5 Payment <br /> I9 Section 2-02.5 is deleted and replaced with the following: <br /> 10 ****** <br /> 11 ( ) <br /> 12 Payment will be made for such of the following bid items as are included in the proposal: <br /> I13 <br /> 14 "Removal of Structure and Obstruction," force account. <br /> 15 All costs associated with removal and disposal of obstructions encountered during removal <br /> 16 of and excavation for roadway or utility components lying outside of the neat line trench <br /> 17 excavation will be paid by force account under the item "Removal of Structures and <br /> 18 Obstructions". Obstruction encountered within the established limits of the utility trench <br /> I19 excavation will be paid as Structure Excavation Class B Incl. Haul in accordance with Section <br /> 20 7-08.5 To provide a common basis for all bidders for the item "Removal of Structures and <br /> 21 Obstructions", the Contracting Agency has entered an amount in the proposal to become a <br /> I22 part of the Contractor's total bid. <br /> 23 <br /> 24 "Sawing Pavement," per linear foot. <br /> I25 "Remove Cement Concrete Sidewalk," per square yard. <br /> 26 "Remove Existing Asphalt Concrete Pavement," per square yard. <br /> 27 "Remove Curb and Gutter," per linear foot. <br /> 28 <br /> I29 The unit contract price for "Remove (Item)" shall include all costs for the work required to <br /> 30 completely remove and dispose of or salvage the item as applicable. <br /> 31 <br /> I32 Removal of items not listed in the Bid Form shall be considered as incidental to the <br /> 33 construction, and the costs thereof shall be included in the various items comprising the <br /> 34 improvement. <br /> I35 <br /> 36 (******) <br /> 37 All costs associated with haul of material shown on the Plans identified for direct haul to the <br /> I38 Contracting Agency's Solid Waste Handling Facility shall be considered incidental to the <br /> 39 respective bid items of the contract and no additional compensation will be made. <br /> 40 <br /> I41 All costs associated with handling and disposal of groundwater extracted adjacent to the <br /> 42 ABW/BM site in the area identified on the Plans shall be considered incidental to the <br /> 43 respective bid items of the contract and no additional compensation will be made. <br /> 44 <br /> I45 "Unanticipated Potentially Hazardous Material Handling And Disposal," by force account as <br /> 46 provided in Section 1-09.6. <br /> 47 <br /> ' 48 All costs associated with storing stockpiled unanticipated potentially hazardous waste and <br /> 49 contaminated soils, collecting, handling and storing unanticipated potentially contaminated <br /> 50 water, loading the stockpiled material into the hauling conveyance for transport to the <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 78 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.