My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 11 <br /> 2 <br /> I3 <br /> 4 2-03.5 Payment <br /> 5 Section 2-03.5 is supplemented with the following: <br /> I67 <br /> 8 <br /> I <br /> 9 "Natural Sand", per ton. <br /> 10 "Crushed Surfacing Base Course", per ton. <br /> 11 <br /> 12 Compaction of import material will be considered incidental to the unit price per ton of import <br /> I13 material. <br /> 14 <br /> 15 2-04 HAUL <br /> 16 Section 2-04 is deleted in its entirety and replaced with the following: <br /> 17 <br /> 18 (February 17, 1998 City of Everett GSP) <br /> I19 2-04 HAUL <br /> 20 <br /> 21 2-04.1 Description <br /> I22 This work shall consist of transporting excavated material from its original site to its final resting <br /> 23 place on the project or at a waste site. <br /> 24 <br /> I25 2-04.3 Construction Requirements <br /> 26 Off-highway earth-moving equipment shall not haul on or across any street not being improved in <br /> 27 the Contract. <br /> I28 <br /> 29 2-04.4 Measurement <br /> 30 Haul work will not be measured. <br /> I31 <br /> 32 2-04.5 Payment <br /> 33 All costs for the work described in Section 2-04 will be considered incidental to excavation. All <br /> I34 costs for haul shall be included in the costs associated with the excavation. <br /> 35 <br /> 36 2-07 WATERING <br /> I37 <br /> 38 2-07.3 Construction Requirements <br /> 39 Section 2-07.3 is supplemented with the following: <br /> I40 <br /> 41 (February 17, 1998 City of Everett GSP) <br /> 42 Only Everett Public Works Department Water Division personnel and the Project Inspector <br /> I43 may authorize the operation of City fire hydrants or making connections to City water mains. <br /> 44 Upon obtaining said permission, the following shall apply: <br /> 45 <br /> 46 (a) The Contractor shall use only those hydrants designated by the agency in charge <br /> 1 47 of water distribution and in strict accordance with its requirements for hydrant <br /> 48 use. A hydrant use permit must be obtained by contacting the Utilities dispatcher. <br /> 49 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 80 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.