My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 7-05.4 Measurement <br /> 2 The second paragraph of Section 7-05.4 is revised to read: <br /> 3 <br /> 5 Pressure Manhole shall be measured per each. Flap gate, extended manhole base, and <br /> 6 threaded tie downs shall not be measured separately. <br /> 7 <br /> 8 7-05.5 Payment <br /> 9 Section 7-05.5 is deleted and replaced with the following: I 10 <br /> 11 (******) <br /> 12 Payment will be made for each of the following bid items that are included in the proposal: <br /> 13 <br /> 14 If required, imported backfill material, shall also be paid under separate unit item. <br /> 15 I 16 "Connection to Existing Manhole", per each. <br /> 17 The unit contract price per each for "Connection to Existing Manhole" shall be full <br /> 18 compensation for all costs necessary to perform the work as specified including excavation, <br /> 19 backfill and compaction around manhole, core drilling in the manhole wall, and reshaping the I <br /> 20 channel when necessary. <br /> 21 <br /> 22 "Shoring or Extra Excavation, Class B", square foot <br /> I <br /> 23 The unit contract price per square foot for"Shoring or Extra Excavation Class B" shall be full <br /> 24 compensation for the work as specified in Section 2-09.5 of the Standard Specifications. <br /> 25 <br /> 26 "Pressure Manhole", per each <br /> 27 The unit contract price per each for "Pressure Manhole" shall be full compensation for all <br /> 28 costs necessary to perform the work as specified including furnishing and constructing the I 29 manhole complete and connected to the sewers, including threaded tie downs, extended <br /> 30 manhole base, flap gate, structure excavation, dewatering, backfilling and compacting, <br /> 31 crushed surfacing, and base course bedding. <br /> I <br /> 32 <br /> 33 <br /> 34 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 35 <br /> I <br /> 36 7-08.2 Materials <br /> 37 Section 7-08.2 is deleted and replaced with the following: <br /> 38 <br /> 39 (******) <br /> 40 Materials shall meet the requirements of the following sections of the Standard Specifications <br /> 41 and these Special Provisions as noted: <br /> 42 <br /> 43 Natural Sand 9-03.2(1) Standard Specifications <br /> 44 Gravel Borrow 9-03.14(1) Special Provisions <br /> 45 Controlled Density Fill 2-09.3(1)E Special Provisions <br /> 46 Crushed Surfacing Base Course 9-03.9(3) Standard Specifications <br /> 47 Construction Geotextile for Separation 9-33.2(1) Standard Specifications <br /> 48 <br /> 49 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 95 OF 117 August 2018 I <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.