Laserfiche WebLink
i <br /> 1 8. Transfer the CSWGP coverage to the Contracting Agency when Physical <br /> 2 Completion has been given and the Engineer has determined that the project <br /> 1 3 site is not stabilized from erosion. <br /> 4 <br /> 5 9. Submit copies of all correspondence with Ecology electronically to the <br /> 1 6 Engineer in a PDF format within four calendar days. <br /> 7 <br /> 8 1-07.5(4) Air Quality <br /> I 9 This section is revised to read: <br /> 10 <br /> 11 The Contractor shall comply with all regional clean air authority and/or State <br /> 12 Department of Ecology rules and regulations. <br /> 13 <br /> 14 The air quality permit process may include additional State Environment Policy Act <br /> I 15 (SEPA) requirements. Contractors shall contact the appropriate regional air pollution <br /> 16 control authority well in advance of beginning Work. <br /> 17 <br /> 18 When the Work includes demolition or renovation of any existing facility or structure that <br /> 19 contains Asbestos Containing Material (ACM) and/or Presumed Asbestos-Containing <br /> 20 Material (PACM), the Contractor shall comply with the National Emission Standards for <br /> 21 Hazardous Air Pollutants (NESHAP). <br /> 1 22 <br /> 23 Any requirements included in Federal and State regulations regarding air quality that <br /> 24 applies to the "owner or operator" shall be the responsibility of the Contractor. <br /> I 25 <br /> 26 1-07.7(1) General <br /> 27 The first sentence of the third paragraph is revised to read: <br /> I 28 <br /> 29 When the Contractor moves equipment or materials on or over Structures, culverts or <br /> 30 pipes, the Contractor may operate equipment with only the load-limit restrictions in <br /> I 31 Section 1-07.7(2). <br /> 32 <br /> 33 The first sentence of the last paragraph is revised to read: <br /> 34 <br /> I <br /> 35 Unit prices shall cover all costs for operating over Structures, culverts and pipes. <br /> 36 <br /> 37 1-07.9(2) Posting Notices <br /> I 38 The second sentence of the first paragraph (up until the colon) is revised to read: <br /> 39 <br /> 40 The Contractor shall ensure the most current edition of the following are posted: <br /> I 41 <br /> 42 In items 1 through 10, the revision dates are deleted. <br /> 43 <br /> I 44 1-07.11(2) Contractual Requirements <br /> 45 In this section, "creed" is revised to read "religion". <br /> 46 <br /> I 47 Item numbers 1 through 9 are revised to read 2 through 10, respectively. <br /> 48 <br /> 49 After the preceding Amendment is applied, the following new item number 1 is inserted: <br /> 1 50 <br /> 111 WEST MARINE VIEW DRIVE UTILITIES PAGE 8 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> IWSDOT AMENDMENTS Rev 4/2/18 <br />