Laserfiche WebLink
1 7-08.AP7 <br /> 2 Section 7-08, General Pipe Installation Requirements <br /> 3 April 2, 2018 <br /> 4 7-08.3(3) Backfilling <br /> 5 The fifth sentence of the fourth paragraph is revised to read: <br /> 6 <br /> 7 All compaction shall be in accordance with the Compaction Control Test of Section 2- <br /> 8 03.3(14)D except in the case that 100% Recycled Concrete Aggregate is used. I <br /> 9 <br /> 10 The following new sentences are inserted after the fifth sentence of the fourth paragraph: <br /> 11 <br /> 12 When 100% Recycled Concrete Aggregate is used, the Contractor may submit a written <br /> 13 request to use a test point evaluation for compaction acceptance. Test Point evaluation <br /> 14 shall be performed in accordance with SOP 738. <br /> 15 <br /> 16 8-01.AP8 <br /> 17 Section 8-01, Erosion Control and Water Pollution Control <br /> 18 April 2, 2018 <br /> 19 8-01.1 Description <br /> 20 This section is revised to read: <br /> 21 <br /> 22 This Work consists of furnishing, installing, maintaining, removing and disposing of best <br /> 23 management practices (BMPs), as defined in the Washington Administrative Code <br /> 24 (WAC) 173-201A, to manage erosion and water quality in accordance with these <br /> 25 Specifications and as shown in the Plans or as designated by the Engineer. <br /> 26 1 27 The Contracting Agency may have a National Pollution Discharge Elimination System <br /> 28 Construction Stormwater General Permit (CSWGP) as identified in the Contract Special <br /> 29 Provisions. The Contracting Agency may or may not transfer coverage of the CSWGP <br /> 30 to the Contractor when a CSWGP has been obtained. The Contracting Agency may not <br /> 31 have a CSWGP for the project but may have another water quality related permit as <br /> 32 identified in the Contract Special Provisions or the Contracting Agency may not have 11133 water quality related permits but the project is subject to applicable laws for the Work. <br /> 34 Section 8-01 covers all of these conditions. <br /> 35 <br /> 36 8-01.2 Materials <br /> 37 The first paragraph is revised to read: <br /> 38 <br /> 39 Materials shall meet the requirements of the following sections: <br /> 40 <br /> 41 Corrugated Polyethylene Drain Pipe 9-05.1(6) <br /> 42 Quarry Spalls 9-13 <br /> 1 <br /> 43 Erosion Control and Roadside Planting 9-14 <br /> 44 Construction Geotextile 9-33 <br /> 45 <br /> 46 8-01.3(1) General <br /> 47 This section is revised to read: <br /> 48 <br /> 49 Adaptive management shall be employed throughout the duration of the project for the <br /> 50 implementation of erosion and water pollution control permit requirements for the <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 27 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />