KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-0 .4 I 1 (2) Item Bids <br /> 2 When the Proposal does not contain the items "Erosion Control and Water Pollution <br /> I <br /> 3 Prevention", Section 8-01.4(1) and 8-01.5(1) are deleted and the Bid Proposal will <br /> 4 contain some or all of the following items measured as noted. <br /> 5 <br /> 6 ESC lead will be measured per day for each day that an inspection is made and a <br /> 7 report is filed. <br /> 8 <br /> 9 Biodegradable erosion control blanket and plastic covering will be measured by the <br /> I <br /> 10 square yard along the ground slope line of surface area covered and accepted. <br /> 11 <br /> 12 Turbidity curtains will be measured by the linear foot along the ground line of the <br /> I <br /> 13 installed curtain. <br /> 14 <br /> 15 Check dams will be measured per linear foot one time only along the ground line of I 16 the completed check dam. No additional measurement will be made for check <br /> 17 dams that are required to be rehabilitated or replaced due to wear. <br /> 18 <br /> I <br /> 19 Stabilized construction entrances will be measured by the square yard by ground <br /> 20 slope measurement for each entrance constructed. <br /> 21 <br /> 22 Tire wash facilities will be measured per each for each tire wash installed. <br /> I <br /> 23 <br /> 24 Street cleaning will be measured by the hour for the actual time spent cleaning <br /> 25 pavement, refilling with water, dumping and transport to and from cleaning <br /> I <br /> 26 locations within the project limits, as authorized by the Engineer. Time to mobilize <br /> 27 the equipment to or from the project limits on which street cleaning is required will <br /> 28 not be measured. I 29 <br /> 30 Inlet protections will be measured per each for each initial installation at a <br /> 31 drainage structure. I <br /> 32 <br /> 33 Silt fenceravel filter, compost berms, and wood chip p berms will be measured by <br /> 34 the linear foot along the ground line of the completed barrier. <br /> 35 <br /> I <br /> 36 Wattles and compost socks will be measured by the linear foot. <br /> 37 <br /> 38 Temporary curbs will be measured by the linear foot along the ground line of the <br /> I <br /> 39 completed installation. <br /> 40 <br /> 41 Temporary pipe slope drains will be measured by the linear foot along the flow line III42 of the pipe. <br /> 43 <br /> 44 Coir logs will be measured by the linear foot along the ground line of the completed I 45 installation. <br /> 46 <br /> 47 Outlet protections will be measured per each initial installation at an outlet location. <br /> 48 <br /> 49 Tackifiers will be measure by the acre by ground slope measurement. <br /> 50 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 37 OF 60 August 2018 t <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.