Laserfiche WebLink
1 8-01.4(3) Reinstating Unit Items with Lump Sum Erosion Control and Water <br /> 2 Pollution Prevention <br /> I <br /> 3 The Contract Provisions may establish the project as lump sum, in accordance with <br /> 4 Section 8-01.4(1) and also include one or more of the items included above in Section <br /> 5 8-01.4(2). When that occurs, the corresponding measurement provision in Section 8- <br /> I <br /> 6 01.4(2) is not deleted and the Work under that item will be measured as specified. <br /> 7 <br /> 8 8-01.4(4) Items not included with Lump Sum Erosion Control and Water Pollution <br /> I 9 <br /> 10 Prevention <br /> Compost blanket will be measured by the square yard by ground slope surface area <br /> 11 covered and accepted. <br /> I 12 <br /> 13 Mulching will be measured by the acre by ground slope surface area covered and <br /> 14 accepted. <br /> 15 <br /> I16 Seeding, fertilizing, liming, mulching, and mowing, will be measured by the acre by <br /> 17 ground slope measurement. <br /> 18 <br /> I19 Seeding and fertilizing by hand will be measured by the square yard by ground slope <br /> 20 measurement. No adjustment in area size will be made for the vegetation free zone <br /> 21 around each plant. <br /> I 22 <br /> 23 Fencing will be measured by the linear foot along the ground line of the completed <br /> 24 fence. <br /> 25 <br /> 26 8-01.5 Payment <br /> 27 This section's content is deleted and replaced with the following new subsections: <br /> I 28 <br /> 29 8-01.5(1) Lump Sum Bid for Project (No Unit Items) <br /> 30 Payment will be made for the following Bid item when it is included in the Proposal: <br /> I 31 <br /> 32 "Erosion Control and Water Pollution Prevention", lump sum. <br /> 33 <br /> 34 The lump sum Contract price for"Erosion Control and Water Pollution Prevention" <br /> I 35 shall be full pay to perform the Work as described in Section 8-01 except for costs <br /> 36 compensated by Bid Proposal items inserted through Contract Provisions as <br /> 37 described in Section 8-01.4(2). Progress payments for the lump sum item "Erosion <br /> I 38 Control and Water Pollution Prevention" will be made as follows: <br /> 39 <br /> 40 1. The Contracting Agency will pay 15 percent of the bid amount for the <br /> I <br /> 41 initial set up for the item. Initial set up includes the following: <br /> 42 <br /> 43 a. Acceptance of the TESC Plan provided by the Contracting Agency or <br /> 44 submittal of a new TESC Plan, <br /> 45 <br /> 46 b. Submittal of a schedule for the installation of the BMPs, and <br /> 47 <br /> 48 c. identifying water quality sampling locations. <br /> 49 <br /> 50 2. 70 percent of the bid amount will be paid in accordance with Section 1- <br /> ' 51 09.9. <br /> 52 <br /> I ' WEST MARINE VIEW DRIVE UTILITIES PAGE 38 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> I ' WSDOT AMENDMENTS Rev 4/2/18 <br />