My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 3. Once the project is physically complete and copies of the all reports <br /> 2 submitted to the Washington State Department of Ecology have been <br /> 3 submitted to the Engineer, and, if applicable, transference of the CSWGP <br /> 4 back to the Contracting Agency is complete, the remaining 15 percent of <br /> 5 the bid amount shall be paid in accordance with Section 1-09.9. <br /> 6 <br /> 7 8-01.5(2) item Bids <br /> 8 "ESC Lead", per day. <br /> 9 <br /> 10 "Turbidity Curtain", per linear foot. <br /> 11 <br /> 12 "Biodegradable Erosion Control Blanket", per square yard. <br /> 13 <br /> 14 "Plastic Covering", per square yard. <br /> 15 <br /> 16 "Check Dam", per linear foot. <br /> 17 <br /> 18 "Inlet Protection", per each. <br /> 19 <br /> 20 "Gravel Filter Berm", per linear foot. <br /> 21 <br /> 22 "Stabilized Construction Entrance", per square yard. I <br /> 23 <br /> 24 "Street Cleaning", per hour. <br /> 25 <br /> 26 "Silt Fence", per linear foot. <br /> 27 <br /> 28 "Wood Chip Berm", per linear foot. <br /> 29 <br /> 30 "Compost Berm", per linear foot. <br /> 31 <br /> 32 "Wattle", per linear foot. <br /> 33 <br /> 34 "Compost Sock", per linear foot. <br /> 35 <br /> 36 "Coir Log", per linear foot. <br /> 37 <br /> 38 "Temporary Curb", per linear foot. <br /> 39 <br /> 40 "Temporary Pipe Slope Drain", per linear foot. <br /> 41 <br /> 42 "Temporary Seeding", per acre. <br /> 43 <br /> 44 "Outlet Protection", per each. <br /> 45 <br /> 46 "Tackifier", per acre. <br /> 47 <br /> 48 "Erosion/Water Pollution Control", by force account as provided in Section 1-09.6. <br /> 49 <br /> 50 Maintenance and removal of erosion and water pollution control devices including <br /> 51 removal and disposal of sediment, stabilization and rehabilitation of soil disturbed ' <br /> 52 by these activities, and any additional Work deemed necessary by the Engineer to <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 39 OF 60 August 2018 <br /> WORK ORDER#3588 <br /> WSDOT AMENDMENTS Rev 4/2/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.