Laserfiche WebLink
I <br /> I1 <br /> 2 DIVISION 1 <br /> I3 GENERAL REQUIREMENTS <br /> 4 <br /> 5 DESCRIPTION OF WORK <br /> I6 <br /> 7 (March 13, 1995 WSDOT GSP) <br /> 8 This Contract provides for the improvement of*** West Marine View Drive Utilities Construction <br /> I9 and associated street restoration and re-channelization disturbed during trenching and pipe <br /> 10 construction. The utility pipes, 36-inch Storm Drain (SD), 30" combined sewer (CS), 12" sanitary <br /> 11 sewer force main (SS FM) begin at the Grand Avenue Park Bridge (Phase 1) boundary north of <br /> I12 the Grand Avenue Utility and Pedestrian Bridge and extend north. The 36" SD includes <br /> 13 maintenance cleanouts and reduces to a 20" pipe at connection to the existing outfall. This outfall <br /> 14 connection requires upgrades to the existing storm system including the installation of a backflow <br /> 15 prevention flap gate within a pressurized manhole. The 30" CS with maintenance access clean <br /> I16 outs extends north past the SD outfall until reaching and connecting to the previously constructed <br /> 17 outfall pipe at 14th Street. The 30" CS pipe is equipped with manual-operated valve and 6" outfall <br /> 18 pipe draining to an existing sanitary sewer manhole in West Marine View Drive (WMVD). The 12" <br /> I19 SS FM parallels the 30"CS in WMVD and veers east at the 14th Street intersection, crossing <br /> 20 WMVD to end outside the north wall of Lift Station No. 7 with a bypass port. Communication <br /> 21 infrastructure at north end of the intersection of 14th Street and WMVD includes the installation of <br /> I22 two communication vaults and conduit between the vaults. All street surface improvements <br /> 23 damaged or removed for the installation of the above improvements require replacement, <br /> 24 including channelization striping. *** and other work, all in accordance with the attached Contract <br /> I25 Plans, these Contract Provisions, and the Standard Specifications. <br /> 26 <br /> 27 1-01.3 Definitions <br /> 28 (January 4, 2016 APWA GSP) <br /> 29 <br /> 30 Delete the heading Completion Dates and the three paragraphs that follow it, and replace them <br /> 31 with the following: <br /> I32 <br /> 33 Dates <br /> I34 Bid Opening Date <br /> 35 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> 36 Award Date <br /> I37 The date of the formal decision of the Contracting Agency to accept the lowest <br /> 38 responsible and responsive Bidder for the Work. <br /> 39 Contract Execution Date <br /> I40 The date the Contracting Agency officially binds the Agency to the Contract. <br /> 41 Notice to Proceed Date <br /> 42 The date stated in the Notice to Proceed on which the Contract time begins. <br /> I43 Substantial Completion Date <br /> 44 The day the Engineer determines the Contracting Agency has full and unrestricted use <br /> 45 and benefit of the facilities, both from the operational and safety standpoint, any <br /> I46 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> 47 replacement of temporary substitute facilities, plant establishment periods, or correction <br /> 48 or repair remains for the Physical Completion of the total Contract. <br /> lWEST MARINE VIEW DRIVE UTILITIES PAGE 10 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />