Laserfiche WebLink
I <br /> 1 Physical Completion Date 1 <br /> Y P <br /> 2 The day all of the Work is physically completed on the project. All documentation <br /> 3 required by the Contract and required by law does not necessarily need to be furnished 1 <br /> A by the Contractor by this date. <br /> 5 Completion Date <br /> 6 The day all the Work specified in the Contract is completed and all the obligations of theI <br /> 7 Contractor under the contract are fulfilled by the Contractor. All documentation required <br /> 8 by the Contract and required by law must be furnished by the Contractor before <br /> 9 establishment of this date. I <br /> 10 Final Acceptance Date <br /> 11 The date on which the Contracting Agency accepts the Work as complete. <br /> 12 I 13 Supplement this Section with the following: <br /> 14 <br /> 15 All references in the Standard Specifications, Amendments, or WSDOT General Special <br /> 16 Provisions, to the terms "Department of Transportation", "Washington State Transportation <br /> 17 Commission", "Commission", "Secretary of Transportation", "Secretary", "Headquarters", and <br /> 18 "State Treasurer" shall be revised to read "Contracting Agency". <br /> 19 <br /> 20 All references to the terms "State" or"state" shall be revised to read "Contracting Agency" <br /> 21 unless the reference is to an administrative agency of the State of Washington, a State <br /> 22 statute or regulation, or the context reasonably indicates otherwise. <br /> 23 <br /> 24 All references to "State Materials Laboratory" shall be revised to read "Contracting Agency <br /> I <br /> 25 designated location". <br /> 26 <br /> 27 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 28 Contracting Agency form(s) by which final payment is authorized, and final completion and <br /> 29 acceptance granted. <br /> 30 <br /> 31 Additive <br /> 32 A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, <br /> 33 which may, at the discretion of the Contracting Agency, be awarded in addition to the base <br /> 34 bid. I 35 <br /> 36 Alternate <br /> 37 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 38 Proposal, from which the Contracting Agency may make a choice between different <br /> 39 methods or material of construction for performing the same work. <br /> 40 <br /> 41 Business Day <br /> I <br /> 42 A business day is any day from Monday through Friday except holidays as listed in Section <br /> 43 1-08.5. <br /> 44 <br /> 45 Contract Bond <br /> 46 The definition in the Standard Specifications for"Contract Bond" applies to whatever bond <br /> 47 form(s) are required by the Contract Documents, which may be a combination of a Payment , <br /> 48 Bond and a Performance Bond. <br /> 49 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 11 OF 117 August 2018 I <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> 1 <br />