My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Physical Completion Date 1 <br /> Y P <br /> 2 The day all of the Work is physically completed on the project. All documentation <br /> 3 required by the Contract and required by law does not necessarily need to be furnished 1 <br /> A by the Contractor by this date. <br /> 5 Completion Date <br /> 6 The day all the Work specified in the Contract is completed and all the obligations of theI <br /> 7 Contractor under the contract are fulfilled by the Contractor. All documentation required <br /> 8 by the Contract and required by law must be furnished by the Contractor before <br /> 9 establishment of this date. I <br /> 10 Final Acceptance Date <br /> 11 The date on which the Contracting Agency accepts the Work as complete. <br /> 12 I 13 Supplement this Section with the following: <br /> 14 <br /> 15 All references in the Standard Specifications, Amendments, or WSDOT General Special <br /> 16 Provisions, to the terms "Department of Transportation", "Washington State Transportation <br /> 17 Commission", "Commission", "Secretary of Transportation", "Secretary", "Headquarters", and <br /> 18 "State Treasurer" shall be revised to read "Contracting Agency". <br /> 19 <br /> 20 All references to the terms "State" or"state" shall be revised to read "Contracting Agency" <br /> 21 unless the reference is to an administrative agency of the State of Washington, a State <br /> 22 statute or regulation, or the context reasonably indicates otherwise. <br /> 23 <br /> 24 All references to "State Materials Laboratory" shall be revised to read "Contracting Agency <br /> I <br /> 25 designated location". <br /> 26 <br /> 27 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 28 Contracting Agency form(s) by which final payment is authorized, and final completion and <br /> 29 acceptance granted. <br /> 30 <br /> 31 Additive <br /> 32 A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, <br /> 33 which may, at the discretion of the Contracting Agency, be awarded in addition to the base <br /> 34 bid. I 35 <br /> 36 Alternate <br /> 37 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 38 Proposal, from which the Contracting Agency may make a choice between different <br /> 39 methods or material of construction for performing the same work. <br /> 40 <br /> 41 Business Day <br /> I <br /> 42 A business day is any day from Monday through Friday except holidays as listed in Section <br /> 43 1-08.5. <br /> 44 <br /> 45 Contract Bond <br /> 46 The definition in the Standard Specifications for"Contract Bond" applies to whatever bond <br /> 47 form(s) are required by the Contract Documents, which may be a combination of a Payment , <br /> 48 Bond and a Performance Bond. <br /> 49 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 11 OF 117 August 2018 I <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.