Laserfiche WebLink
I <br /> 1 • Changes made by Change Order or Field Order. I <br /> 2 • Changes made by the Contractor. <br /> 3 • Accurate locations of storm sewer, sanitary sewer, water mains and other water <br /> 4 appurtenances, structures, conduits, light standards, vaults, width of roadways, <br /> 5 sidewalks, landscaping areas, building footprints, channelization and pavement <br /> 6 markings, etc. Include pipe invert elevations, top of castings (manholes, inlets, etc.). t <br /> 7 <br /> 8 If the Contract calls for the Contracting Agency to do all surveying and staking, the Contracting <br /> 9 Agency will provide the elevations at the tolerances the Contracting Agency requires for the <br /> 10 Record Drawings. <br /> 11 <br /> 12 When the Contract calls for the Contractor to do the surveying/staking, the applicable <br /> I <br /> 13 tolerance limits include, but are not limited to the following: <br /> Vertical Horizontal <br /> As-built sanitary& storm invert and grate ± 0.01 foot ± 0.01 foot <br /> I <br /> elevations <br /> As-built monumentation ± 0.001 foot ± 0.001 foot <br /> As-built waterlines, inverts, valves, ± 0.10 foot ± 0.10 foot <br /> I <br /> hydrants <br /> As-built ponds/swales/water features ± 0.10 foot ± 0.10 foot <br /> As-built buildings (fin. Floor elev.) ± 0.01 foot ± 0.10 foot I <br /> As-built <br /> as lines, power, TV, Tel, Com ± 0.10 foot ± 0.10 foot <br /> 9 <br /> As-built signs, signals, etc. N/A ± 0.10 foot I 14 <br /> 15 Making Entries on the Record Drawings: <br /> 16 <br /> 17 • Use erasable colored pencil (not ink) for all markings on the Record Drawings, <br /> 18 conforming to the following color code: <br /> 19 • Additions - Red <br /> I <br /> 20 • Deletions - Green <br /> 21 • Comments - Blue <br /> 22 • Dimensions- Graphite <br /> I <br /> 23 • Provide the applicable reference for all entries, such as the change order number, the <br /> 24 request for information (RFI) number, or the approved shop drawing number. <br /> 25 • Date all entries. <br /> 26 • Clearly identify all items in the entry with notes similar to those in the Contract <br /> 27 Drawings (such as pipe symbols, centerline elevations, materials, pipe joint <br /> 28 abbreviations, etc.). <br /> I <br /> 29 <br /> 30 The Contractor shall certify on the Record Drawings that said drawings are an accurate <br /> 31 depiction of built conditions, and in conformance with the requirements detailed above. The <br /> 32 Contractor shall submit final Record Drawings to the Contracting Agency. Contracting <br /> I <br /> 33 Agency acceptance of the Record Drawings is one of the requirements for achieving <br /> 34 Physical Completion. <br /> 35 <br /> I <br /> 36 Payment will be made for the following bid item: <br /> 37 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 29 OF 117 August 2018 I <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />