Laserfiche WebLink
11. Accessibility to public transit and traffic reduction measures proposed by the <br />applicant to reduce dependence of the proposed use on the automobile. <br />Findin : The faciliiy is unmanned. <br />Conclusion: Criteria is not applicable. <br />B. SPU SPECIFIC EVAL�ATION CRITERIA: <br />Subsection 41.150.D.1.c of !' � Zoninq Code — Special property use Permits — contains <br />specific evaluation Criteria for Above Ground Utility and Communication Facilities. Many of <br />these criteria are intended to address new or expanded utility structure (i.e., monopoles) <br />and are not applicable to the instant application. The following are'Findings" and <br />"Conclusions" relative to the Specific Evaluation Criteria: <br />1. All utility and Communications facilities shall be designed, landscaped, or <br />o;herwise screened to ensure compatibility with surrounding properties. <br />Findin : T-Mobile's proposed antenna modification will be painted to match the existing <br />flagpole to insure compatibility with surrounding propeities. <br />2. Antennas associated with above ground utility of communication facilities shall be <br />located on existinc� or replacement !owers or structures to the maximum extent <br />tecimically feasible to discourage ihe proliferation of tower structures. <br />Findin : The proposal is to add antennas lo an existing (lagpole communications utility pole. T- <br />Mobile is already collocated on the pole. When proposed to be located on an existing or <br />replaceinent utility or communications structure or other non-residential structure in a residential <br />zone, Review Process II shall be required. <br />3. Tower structures for above ground utility andlor communications facilities shall not <br />be located in or within 300 feet of residentially zones areas. <br />Findin : No tower struclure is being proposed or modified. <br />4. When tower structures for above-c�round utility and/or communications facilities are <br />proposed to be located witliin 300 fcet of residentially zoned areas, in or within 200 <br />feet of gateway corridors as desic�nated by tlie Everett Comprehensive Plan, or in or <br />witliin 200 feet or areas under tiie jurisdiction of the Shoreline Master Program, <br />zones which otherwise require Review Process II shall use Review Process III. <br />Pindin : No tower structure is being proposed or modified. <br />,. AII irtility and communication facililies shall be installed undergrowid or within <br />structures to the greatest extent practicai in order to maximize satety and <br />minimize visual and noise impacts upon surrounding properties. <br />Findin : T-Mobile's antenna modification is located on a previously approved (lagpole <br />communications facility and there are no changes to the existing ground equipment or proposai <br />to increase the height of the flagpole. <br />