Laserfiche WebLink
i <br /> i <br /> I Providence Family Services Center 9-91M-�2�z3-0 <br /> August25, 1999 Page10 <br /> � <br /> � 6.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Development plans call far construction of a new four- or five-story at-grade building, with the <br /> � possible addition of one or two future stories. We offer the following general geotechnical <br /> � conGusions and recommendations conceming this project. <br /> I • Feasi ili : Based on our field explorations,research, and analyses,the proposed <br /> building appears feasible from a geotechnical standpoint, contingent on proper <br /> design, layout, and construction. <br /> ! • Foundation Ontions: On our opinion, shallow spread fooGngs are not generaily <br /> suitable for supporting the proposed structure,due to the variable thidcness of loose <br /> i to medium-dense fill and native soils. For the northwestem portion of the building, <br /> ! we recommend the use of a pile or pier foundation extending downward to the very <br /> dense glacial till deposit, which lies at depths ranging up to 30 feet below existing <br /> i grades. However, spread footings appear feasible for the southeastem portion of <br /> the building, where the glacial till horizon is less than about 5 feet deep. Spread <br /> footings aiso might be feasible for other portions if a basement is included beiow the <br /> Ibuilding. <br /> • Floor Ontions: Soil conditions are not generally amenable to the use of a <br /> I soil-supported slab-on-grade fleor,due to the extreme variation in thickness of the <br /> loose to medium-dense soil deposits. To minimize settlements of the northwestem <br /> portion of the fioor, we recommend using a structurally supported floor, such as a <br /> post-tensioned concrete slab, reinforced concrete slab,orjoist-supported dedc. A <br /> soil-supported floor might be suitable for this portion if some settlements can be <br /> tolerated. The southeastem portion of the buildir.�footprint is better suited for use <br /> of a soil-supported slab-on-grade floor. <br /> • Retainina Wall O�tions: In our opinion, conventional backfilled, cast-in-place <br /> concretewallswillad� ;�atelysupportpartialbasementexcavations, loadingdodcs, <br /> utiliry vaults, and other below-grade features. These walls shouid be designed to <br /> � withstand appropriate lateral pressures. <br /> • Ravine Setbacks: The currently proposed building footprint lies approz,mately <br /> 100 fest horizontally from the existing ravine brink. In our opinion, based on our <br /> slope stability analysis, this distance constitutes a conservative se!back from the <br /> ravine;a lesser setback could be used For the building if desired,but we recommend <br /> that the final setback distance not be less than 50 feet. For pavements, utilities, <br /> luminaires, and other minor elements, we recommend maintaining a minimum <br /> setback of 15 feet from the brink; this would p;ovide adequate protection from a <br /> seismically induced slope failure, which our analysis indicated is most likely to <br /> � originate at a distance of about 10 to 12 feet from the brink. <br /> '' S\WORDPROC�59Vrolec15�5otCe�1100Gs1f712]RaCinsomPrm+CenceMmo�Rpl.wpE �17\ <br /> � <br /> � <br />