Laserfiche WebLink
• WRK will visit the building at least two times to further investigate and detail the as-built <br /> conditions. During these site visits WRK will also identify constructability issues with our proposed <br /> strengthening scheme and make adjustments as necessary. <br /> • WRK will identify locations at each building where non-destructive testing, using GPR, will be <br /> performed to verify the presence and spacing of wall reinforcing as shown on the original <br /> construction documents. WRK may also request destructive investigation be performed, such a <br /> concrete cores for compressive strength determination, with the permission of the City. <br /> • WRK will identify temporary protection measures that may need to be installed at the beginning <br /> of construction to protect building occupants during construction. <br /> • WRK and the City assume there will be no modifications or upgrades for the HVAC, electrical or <br /> plumbing systems for these buildings as part of this project. <br /> • WRK has made an allowance for preparing a Construction Cost Estimate at the completion of the <br /> Schematic Design phase and an update for the completion of the Construction Document phase. <br /> During this phase, WRK will attend and participate in project team meetings to coordinate the work. We <br /> will also be available via telephone to resolve specific issues that may arise during this phase of the project. <br /> Permitting Phase <br /> For the Permitting Review phase, we have included an allowance in our scope of services to respond to <br /> agency plan check comments. We understand the City of Everett Building Department will review the <br /> project drawings, calculations and specifications. <br /> WRK will assist the City with submission of the project to the Building Department. The seismic <br /> strengthening work will be considered "voluntary" by the Building Department. <br /> Bidding/Negotiation Phase <br /> We assume the City will solicit and procure the General Contractor for the project. However, WRK will <br /> assist by responding to questions during bidding and negotiations. <br /> Construction Administration <br /> During Construction Administration, WRK will review required submittals, respond to General Contractor <br /> requests for information (RFI's), review change proposals related to our work, and issue bulletins and <br /> supplemental instructions as needed. <br /> WRK will visit the site at appropriate intervals to observe the general progress of construction. WRK <br /> understands that the construction will be phased and the total duration may last up to 24 months. This <br /> proposal is based on being on-site for project progress meetings and structural observation 36 times over <br /> the course of construction (i.e. 1.5 times per month). <br /> Any detailed inspection and any special inspections required by the local jurisdiction or the Building Code <br /> are the responsibility of the City of Everett <br /> Page 5 of 7 <br />