My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2019-02-01
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2019-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 7:36:13 AM
Creation date
12/21/2018 7:25:37 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT CLOSE-OUT <br /> 017000- 4 <br /> 3. As part of this instruction for operating equipment demonstrate the following <br /> procedures: <br /> Start-up <br /> Shut-down <br /> Emergency operations <br /> Noise and vibration adjustments <br /> Safety procedures <br /> Economy and Efficiency adjustments <br /> Effective energy utilization <br /> 5. POST CONSTRUCTION INSPECTION <br /> 6.1. The Architect/Engineer and the Owner will conduct an inspection just prior to one <br /> year following the date of Substantial Completion. The Contractor will be asked to <br /> be present. The purpose of this inspection is to identify any warranty items or <br /> material failures. A report will be issued with determination by the Architect as to <br /> the Contractor's responsibility. Contractor is required to make necessary repairs or <br /> corrections within thirty(30) days following notification. <br /> End of Section 017000 <br /> I <br /> 02/19/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.