Laserfiche WebLink
I <br /> CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOLS 09/12/2013 <br /> 2. 4-1/2" O.D. Galvanized steel gooseneck and 23'4""crossbar <br /> 3. 20'H 2-3/8" O.D Steel uprights <br /> 4. Fully adjustable in two directions insures crossbar is perfectly level and uprights are vertically plum I <br /> 5. Entire goals powder coated yellow <br /> 6. Installation by exclusive leveling plate allows adjustment for correct alignment and built-in leveling <br /> jacks for vertical adjustment <br /> 7. Access frame kit: JayPro Co.,model FBGPAF-IA&C <br /> PART 3—EXECUTION <br /> 3.1 GENERAL <br /> A. Locate items in accordance with the drawings,details, and install as per specifications. <br /> 3.2 BLEACHER UNIT <br /> A. Contractor shall issue Shop Drawing for approval of anchoring Unit to the concrete pad. Tie down fittings <br /> shall be steel construction and non-rusting. Protect the aluminum frame from the steel tie-down fittings with <br /> the use of a 3/8"thick rubber gasket. <br /> 3.3 CLEAN UP <br /> A. Finish all surfaces and areas impacted by SITE FURNISHINGS installation to their finished design <br /> conditions. <br /> B. Remove all wrapping materials,trash,deleterious materials,etc. from the site. <br /> C. Owner will inspect approve all finished work before final payment of Contract. <br /> END OF SECTION 12 9300 <br /> SITE FURNISHING 129300-2 <br />