My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2019-02-01
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2019-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 7:36:13 AM
Creation date
12/21/2018 7:25:37 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOL 09/12/2013 <br /> D. Before turf is installed, Synthetic Turf Installation Contractor will inspect the finish grade for his <br /> II approval of the sub-base installation including planarity. General Contractor shall make his laser <br /> equipment available for use by Synthetic Turf Installation Contractor if necessary. <br /> 1 3.3 INSTALLATION OF BASE SYSTEM FOR INFILL TURF <br /> A. See Section 32 1800 Shock Pad. <br /> M <br /> 3.4 INSTALLATION OF SYNTHETIC TURF <br /> A. The Turf Project Superintendent shall thoroughly inspect all materials delivered to the site both for <br /> quality and quantity to assure that the entire installation shall have sufficient material to maintain <br /> proper mixing ratios. <br /> IB. Refer to Brock Shock Pad installation instructions prior to installation. <br /> C. Synthetic turf shall be loose laid across the field, stretched, and attached to the perimeter edge detail. <br /> - Turf shall be of sufficient length to permit full cross-field installation. No head or cross seams will be <br /> allowed in the playing field inside the playing field sidelines. <br /> D. Seams shall be stitched or glued. All main turf fabric seams shall be transverse to the field direction; <br /> i.e., run perpendicularly across the playing field. Seams shall be straight, flat, tight, and permanent <br /> with no separation or fraying. If Contractor opts to stitch seams, only locking stitches shall be used. <br /> Bag stitches will not be allowed. <br /> E. No gluing shall be allowed when the air temperature is below 50 degrees. <br /> F. Apply infill materials in numerous thin lifts using special broadcasting equipment. The turf shall be <br /> raked and brushed properly as the mixture is applied. The infill material shall be installed to a depth of <br /> about 1.5 to 1.75 inches in order to comply with initial Gmax standards. <br /> 3.5 SHOCK ABSORBANCY OF THE SYNTHETIC FIELD SYSTEM <br /> A. The synthetic turf system installation, designed for multiple sport usage will be periodically tested for <br /> n shock attenuation (G-max) properties in accordance with ASTM F 1936 and F355, Method A, per <br /> frequency intervals and G-max compliance standards provided herein. <br /> 1. Test Locations <br /> a. The installed system will be tested for Gmax at the locations defined in ASTM F 1936 as <br /> modified with 2 additional locations for the soccer field at: 1)one soccer goalmouth and 2) <br /> I one corner of a penalty box. <br /> b. All test locations will be offset approximately 12-inches from any fabric seam, and all <br /> subsequent re-testing will be performed at the exact same locations as previous test <br /> locations for comparisons. <br /> 2. Test Frequency and G-max Compliance Standards: <br /> a. The Synthetic Turf Contractor will arrange for and pay for the testing of the synthetic turf <br /> field for G-max Average compliance: In addition to the initial G-max testing of the <br /> installed field at, additional G-max testing is also required at Turf Contractor's expense as <br /> follows: <br /> INFILLED SYNTHETIC TURF 32 1822-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.