Laserfiche WebLink
INSPECTIONS AND TESTS <br /> 014000 - 3 <br /> shall require the Contractor to remove all materials as necessary to allow specified <br /> inspections at the Contractors expense. <br /> 5. TEST REPORTS <br /> 1. Testing authority shall promptly process and distribute all required copies of test <br /> reports and related instructions to ensure all necessary retesting and/or replacement <br /> of materials with the least possible delay to progress of the work. <br /> 2. Inspection and test reports distributed to Owner, Architect, Contractor and Building <br /> Official. <br /> 6. REPAIR AND PROTECTION <br /> 1. Upon completion of inspection, testing, sample-taking and similar services <br /> performed on the work, repair damaged work and restore substrates and finishes to <br /> eliminate deficiencies, including deficiencies in the visual qualities of exposed <br /> finishes. Comply with the Contract document requirements for"Cutting and <br /> Patching". Protect work exposed by or for quality control service activities, and <br /> protect repaired work. Repair and protection is the Contractor's responsibility, <br /> regardless of the assignment of responsibility for inspection, testing or similar <br /> services. <br /> END OF SECTION 014000 <br /> 02/19/13 <br />