Laserfiche WebLink
TEMPORARY FACILITIES <br /> 015000 - 9 <br /> 6.4. Termination and Removal: Remove each temporary service and facility promptly <br /> when need has ended, or when replaced by use of a permanent facility,but no later <br /> than Substantial Completion. Complete, or, if necessary, restore permanent work <br /> delayed because of interference with the temporary service or facility. Repair <br /> damaged work, clean exposed surfaces and replace work which cannot be repaired. <br /> 1. At Substantial Completion, clean and renovate permanent services and <br /> facilities that have been used to provide temporary services and facilities <br /> during the construction period. <br /> 2. Remove temporary fencing at the conclusion of work,by phase or end of <br /> project unless otherwise noted in the Contract Documents. <br /> End of Section 015000 <br /> 02/19/13 <br />