My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2019-02-01
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2019-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 7:36:13 AM
Creation date
12/21/2018 7:25:37 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOLS 08/09/2013 <br /> SECTION 01 57 13—TEMPORARY EROSION AND SEDIMENT CONTROL <br /> PART 1 -GENERAL <br /> 111 1.1 RELATED DOCUMENTS <br /> A. Drawings and general provisions of the Contract, including General and Supplementary <br /> Conditions and Division 01 Specification Sections, apply to this Section. <br /> 1.2 SUMMARY <br /> A. Work of this Section includes,but is not limited to,the following: <br /> 1. Transfer NPDES permit from Owner to Contractor in accordance with Washington State <br /> Department of Ecology requirements. <br /> 2. Conform to all requirements of the NPDES Permit, the Construction Stormwater Pollution <br /> Prevention Plan(SWPPP),and the Construction Stormwater General Permit. <br /> 3. Provide Certified Erosion and Sediment Control Lead"CESCL." <br /> 4. Provide and maintain temporary erosion control measures as indicated in the Contract <br /> Documents and as required by the Washington State Department of Ecology. <br /> 5. Provide and maintain additional temporary erosion control measures at no additional cost to <br /> the Owner as may become necessary due to weather, environmental, or site conditions. <br /> Comply with Washington State Department of Ecology requirements. <br /> 6. Prevent pollution or excess turbidity in downstream and/or State waters. <br /> 7. Removal of temporary erosion control measures after completion of project. <br /> 8. Submit "Notice of Termination Form" for Construction Stormwater General Permit to <br /> Department of Ecology to request termination of permit coverage. <br /> B. Related sections include the following: <br /> 1. Section 01 0100,"Summary of the Work"for project requirements. <br /> 2. Section 01 0270, "Applications for Payment" and 01 37 00, "Schedule of Values" for <br /> values associated with ESC measures,ESC maintenance,monitoring and documentation of <br /> stormwater discharges and compliance with NPDES and SWPPP. <br /> 3. Section 01 5000, "Temporary Facilities" for temporary utilities,temporary construction and <br /> support facilities,temporary security and protection facilities, and environmental protection <br /> measures during site operations. <br /> 4. Section 02 4119, "Selective Demolition." <br /> 5. Section 33 4600, "Subgrade Drainage" for soil materials, excavating, backfilling, and site <br /> grading. <br /> 1.3 REFERENCE STANDARDS <br /> A. WSDOT Standard Specifications for Road,Bridge and Municipal Construction,2010 edition. <br /> B. WSDOT Standard Plans for Road,Bridge and Municipal Construction, 2010 Edition. <br /> C. Conform to OSHA(Occupational Safety and Health Act)requirements. <br /> TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13-1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.