Laserfiche WebLink
I <br /> CASCADE HIGH SCHOOL SYNTHETIC TURF FIELD <br /> EVERETT PUBLIC SCHOOLS 08/09/2013 <br /> E. Submit copies of CESCL field reports, ESC maintenance reports and stormwater sampling <br /> reports to DOE,Owner and Architect. <br /> F. At completion of project, submit copy of Site Log Book documenting construction practices, <br /> stormwater sampling reports,ESC measures,and checklists used during the project. <br /> G. Certifications <br /> 1. Provide a letter, signed by the supplier and reviewed and also signed by an officer of the <br /> General Contractor's company, certifying that the following products to be incorporated <br /> into the work meet the requirements specified. <br /> 2. All product submittals shall be submitted to the Engineer for review and approval. Erosion <br /> Control construction shall not commence until all submittals have been approved by the <br /> Engineer. <br /> 3. Products: <br /> a. Plastic Sheeting <br /> b. Sedimentation Tanks <br /> c. Silt Fence <br /> d. Storm Inlet Protection <br /> e. Quarry Spalls <br /> H. Additional Measures: <br /> 1. Provide submittals in compliance with Section 01 63 00, "Products and Substitutions" for <br /> additional measures that are necessary to prevent stormwater discharge from the site in <br /> compliance with the Contract Documents, local jurisdiction, and NPDES requirements. <br /> These measures may include but are not limited to the following: <br /> a. Electro-Coagulation <br /> b. Filtration Systems <br /> c. Chitosan Stormwater Treatment System <br /> I. Schedule of Values provided in compliance with Contract Documents shall include line item <br /> categories that indicate the cost value for the following work activities: <br /> 1. Labor, equipment, and materials for initial installation of erosion and sediment control <br /> plan. <br /> 2. Labor, equipment, and material for maintenance and enhancements of erosion control <br /> measures. <br /> 3. Labor,equipment,and materials for removal of erosion and sediment control measures. <br /> 1.7 PROJECT CONDITIONS <br /> A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent <br /> occupied or used facilities during site clearing operations. <br /> 1. Do not close or obstruct streets,walks or other adjacent occupied or used facilities without <br /> permission from Owner and authorities having jurisdiction. <br /> 2. Provide alternate routes around closed or obstructed traffic ways if required by authorities <br /> having jurisdiction. <br /> TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13-3 <br />