Laserfiche WebLink
ti <br /> At the hearing the following exhibits were submitted and were admitted as part of the <br /> official record of these proceedings: <br /> 1. Staff Report <br /> 2. JARPA Application <br /> 3. Landscape Modification Narrative <br /> 4. Plan Set <br /> 5. Preliminary Binding Site Plan <br /> 6. Final MDNS <br /> 7. SEPA Checklist <br /> 8. Biological Assessment <br /> 9. Geotechnical Report <br /> 10. Preliminary Storm Drainage Report (Available for Review at Planning <br /> Department) <br /> 11. Transportation Impact Analysis <br /> 12. FEMA Letter of Map Revision <br /> 13. City/Port Public Access Improvement Agreement <br /> 14. Notice of Application and Hearing <br /> 15. Agency Comments <br /> 15a. Public Works <br /> 15b. Fire Department <br /> 15c. Snohomish County PUD <br /> 16. Power Point <br /> 17. email to Planning Department dated March 8, 2017, from Jamin Woody, Motor <br /> Trucks <br /> Subsequent to the hearing, as ordered by the Hearing Examiner, the following exhibit <br /> was submitted and admitted as part of the official record of these proceedings <br /> 18. Letter to John Jimerson, Planning Department, from Todd Oberg, The Blueline <br /> Group, dated March 9, 2017 <br /> All of the exhibits are available for inspection at the Hearing Examiner's Office <br /> located at 2930 Wetmore Avenue, 8th floor, Everett, Washington. <br /> Based upon a review of the above record, the following Findings of Fact and <br /> Conclusions hereby constitute the basis of the decision of the Everett Hearing <br /> Examiner. <br /> FINDINGS OF FACT <br /> General Findings <br /> 1. The Applicant requested approval of a shoreline permit, a two-lot binding site <br /> plan and a landscape modification to reduce the width of the landscaping <br /> along the interior property lines for a project at 400 Riverside Road (lots 2 and <br /> 4 of the Riverside Business Park), Everett, Washington. The proposal <br /> I2 1 <br />