Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Include cost of cleanupvacuum collection and disposal of the cuttings slurrywith this bid <br /> by p 9 <br /> item as there will be no separate payment for cleanup. <br /> IBid Item 14 - Saw-Cutting Concrete Curb & Gutter & Sidewalk <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> I Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete curb and gutter and <br /> sidewalk, shall be full compensation for all labor, material, tools, and equipment necessary <br /> I to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> Specifications, these Special Provisions and as shown on the Plans. The unit price per <br /> lineal foot for the final saw-cutting of concrete curb and gutter and sidewalk includes, but is <br /> I not limited to, the saw-cutting necessary for the final joint between existing concrete <br /> sidewalk or curb and permanent concrete repair. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> I item as there will be no separate payment for cleanup. <br /> Bid Item 15 - Foundation Material, Class A or B <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> IMeasurement for Foundation Material, Class A or B shall be by the ton, recorded on <br /> certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed <br /> within the limits of dimensions defined in the Work, descriptions for other bid items, shown <br /> Ion the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br /> equipment required to furnish, place, and compact foundation material as specified in the <br /> I Standard Specifications, these Special Provisions and as shown on COE Standard <br /> Drawing No. 614. <br /> The unit price for this bid item includes all costs for dewatering and over-excavation, <br /> I removal, haul, and disposal of unsuitable subgrade material below the pipe zone or <br /> roadway subgrade. <br /> Bid Item 16 - Gravel Borrow <br /> IMeasurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> I accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or <br /> COE Standard Drawings, or as otherwise approved by the Engineer. <br /> I Measurement for gravel borrow shall be limited to maximum trench widths defined in the <br /> work descriptions for other bid items. <br /> The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br /> I compensation for all labor, material, tools and equipment necessary to furnish imported <br /> gravel borrow for trench backfill where Engineer has determined native soils are not <br /> suitable for backfill, and other Work as required, from a Contractor-supplied source in <br /> accordance with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br /> IThe unit price for gravel borrow shall include all costs of furnishing. hauling, stockpiling, <br /> placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> Idisplaced unsuitable material, including haul. <br /> Bid Item 17 - Ductile Iron Pipe for Watermain, 4-Inch Diam. <br /> I Watermain Replacement"T" Division B—BID DESCRIPTIONS October 10, 2018 <br /> WO No.—UP3684 SP -7 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.