1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 18 - Ductile Iron Pipe for Watermain, 6-Inch Diam. <br /> Bid Item 19 - Ductile Iron Pipe for Watermain, 8-Inch Diam. I <br /> Bid Item 20 - Ductile Iron Pipe for Watermain, 12-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the <br /> vertical intersection of the centerline of the pipe measured with the centerline of the <br /> intersection pipe, or with the beginning or ending of any new linear length of valves or <br /> couplings contained within the measured length. At changes in pipe size connected by a <br /> reducer, the point of measurement shall be taken as the midpoint of the reducer. <br /> The unit contract price for Ductile Iron Pipe For Watermain. -Inch Diam.. shall constitute <br /> full compensation for all labor, materials, tools and equipment necessary to furnish and <br /> install the pipe, restrained joints (where shown on the Plans or as required by the Standard <br /> Specifications and Special Provisions), and all fittings, including tees, crosses, reducers, <br /> couplings, and sleeves required for complete installation along the run of each pipe size, as <br /> shown on the Plans and specified herein, and additionally, shall include, but not be limited <br /> to, the following: <br /> 111 <br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of the existing asphalt or <br /> concrete pavement, sidewalk, curb. thrust blocks, miscellaneous landscaping, and sod <br /> as indicated on the Plans. <br /> 2. All required potholing to verify locations of water service crossings and existing utilities. <br /> The costs for pot-holing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no direct compensation <br /> made. <br /> 3. Utility or light pole holding in conformance with the requirements of the applicable utility <br /> including, if necessary, arranging for the utility to hold poles and paying the associated <br /> fees. <br /> 4. Trench excavation and dewatering, installation of pipe, furnishing, placing and <br /> compacting sand backfill for pipe bedding, furnishing, placing and compacting suitable <br /> native material for trench backfill and placing and compacting imported backfill <br /> material. No extra payment shall be made for removing, loading, hauling, and <br /> disposing of displaced and unsuitable material. <br /> 5. Maintenance, restoration and/or relocation, if required, of existing culverts. storm <br /> drainage pipe, other utilities and structures affected by construction that are to remain. <br /> 6. - Temporary and permanent thrust blocking and dead man blocks, and temporary and <br /> permanent restraint systems. <br /> 7. Ethafoam pads or sand backfill between watermain and other pipes. <br /> 8. Maintenance of existing watermain and provisions for interim water service. <br /> 9. Pressure and purity testing of all watermains and shall include providing temporary <br /> blow-offs, backflow prevention, air gap apparatus, flushing, and disinfecting as <br /> necessary for testing in accordance with 7-09.3(24) of these Special Provisions and <br /> COE Standard Drawing No. 526. <br /> 10. Extra depth, including excavation, backfill and compaction required to clear known <br /> buried utilities or other known obstacles. <br /> 11. Abandonment of existing watermains as shown on the Plans, including cutting, <br /> draining water and properly disposing. and plugging pipe at each end with a minimum <br /> of 2-feet of Commercial concrete or CDF. Include the concrete or CDF work with this <br /> work with no direct compensation being made. Abandon existing mains in place where <br /> Watermain Replacement"T" Division B—BID DESCRIPTIONS October 10, 2018 <br /> WO No.—UP3684 SP -8 <br /> I <br />