My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-01 DEFINITIONS AND TERMS , <br /> 1-01.3 Definitions <br /> Delete the three paragraphs under the heading Completion Dates, and substitute the <br /> following: <br /> Substantial Completion Date: The day the Engineer determines the City has full and <br /> unrestricted use and benefit of the facilities, both from the operational and safety <br /> standpoint, any remaining traffic disruptions will be rare and brief, and only minor <br /> incidental work, replacement of temporary substitute facilities, plant establishment <br /> 111 <br /> periods, or correction or repair remains for the Physical Completion of the total <br /> Contract. <br /> Physical Completion Date: The day all of the Work is physically completed on the <br /> project. All documentation required by the Contract and required by law does not <br /> necessarily need to be furnished by the Contractor by this date. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical ' <br /> work, including Punch List, is complete and Contractor has completed and fulfilled all <br /> contractual obligations except any maintenance of landscaping. Contractual <br /> obligations that must be fulfilled prior to achievement of the Completion Date include, <br /> and are not limited to; the Contractor's furnishing all documentation, including correct, <br /> complete and accurate as-built or record drawings and operation and maintenance <br /> manuals and transfer of warranties. (This definition replaces the definition in WSDOT <br /> 1-01.3 for Completion Dates.) <br /> Revise the following definitions to read as follows: <br /> Bid Documents: The component parts of the proposed Contract which may include, <br /> but are not limited to, the Proposal Form, the proposed Contract Provisions, the <br /> proposed Contract Plans, and Addenda. (This definition replaces the definition in <br /> WSDOT 1-01.3 for Bid Documents.) <br /> Contract: Written agreement signed between the Owner and Contractor and includes <br /> Division C — CONTRACT, Division P - PROPOSAL, Division B — BID ITEM <br /> DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications and <br /> amendments, Standard Plans in effect as of the date Bids are opened, Addenda, <br /> supplemental agreements, change orders, certifications and affidavits required by this <br /> Contract and by law, and Federal requirements that apply to this Contract and Project. <br /> (This definition replaces the definition in V SDOT 1-01.3 for Contract.) <br /> Contract Bond(s): Include a separate performance bond and payment bond, as set <br /> forth in the Contract Documents. (This definition supplements the definition in WSDOT <br /> 1-01.3 for Contract Bond.) <br /> Engineer: The City's representative who administers the construction program for the <br /> City. Provisions in the Contract Documents that state the Engineer "shall" or "will" shall <br /> be deemed to mean that the Engineer shall or will take such action if requested in <br /> writing by the Contractor. (This definition replaces the definition in WSDOT 1-01.3 for <br /> Engineer.) , <br /> Specifications: Includes VJ <br /> 2018 SDOT/APWA Standard Specifications and latest <br /> Amendments, and all other specifications (including these Special Provisions) for the <br /> prescribed Work in this Contract. (This definition replaces the definition in WSDOT 1- <br /> I <br /> 01.3 for Specifications.) <br /> Working Drawings: Drawings, shop drawings. plans, diagrams, or calculations, <br /> including a schedule of submittal dates for Working Drawings where specified, which <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—42 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.