My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 City's Representative are not required or obligated to consider or review a request for <br /> substitution and may, in their sole discretion and option, consider or review such <br /> I requests. <br /> If the offered substitution requires changes to or coordination with other portions of the <br /> Work, include, if any, drawings and details showing such changes. The Contractor <br /> I agrees to perform these changes as part of the substitution of material or Equipment at <br /> no additional cost to the City. Approval of a substitution request will not relieve the <br /> Contractor from responsibility for the efficiency, quality, and performance of the <br /> I substitute material or Equipment, in the same manner and degree as the material and <br /> Equipment originally specified. Reflect cost differential associated with a substitution <br /> in the offer. If the City approves the substitution, the Contract Documents will be <br /> I modified by a Change Order modifying the Contract Sum in the amount of the cost <br /> differential. <br /> 1-06.2 Acceptance of Materials <br /> I 1-06.2(2)B Financial Incentive <br /> Delete 1-06.2(2)B. <br /> 1-06.2(2)D Quality Level Analysis <br /> IDelete 1-06.2(2)D. <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> I Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior <br /> to use, the Engineer may accept certain Equipment on the basis of a Manufacturer's <br /> I Certificate of Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where <br /> compliance to Contract requirements is not readily determinable through inspection <br /> I and testing of materials or Equipment. The Contractor shall provide properly <br /> authenticated documents to the City's Representative that the materials and <br /> Equipment comply with the Contract requirements. <br /> I The Contractor shall pay all associated costs of providing each Manufacturer's <br /> Certificate of Compliance submitted for City acceptance. <br /> The City reserves the right to refuse to accept Equipment on the basis of a <br /> 1 Manufacturer's Certificate of Compliance. <br /> 1-06.3(1) Inspection at Point of Manufacturing <br /> (******) <br /> I The Contractor shall be responsible to reimburse the City for the costs of inspections <br /> at the point of manufacturing for inspections occurring outside of Whatcom, Skagit, <br /> Island, Snohomish. King, Pierce and Thurston counties. Costs to be paid or <br /> I reimbursed by the Contractor include, but are not limited to, travel, subsistence, labor <br /> and lodging expenses of the City Inspector. <br /> Point of manufacturing inspection will be required if: <br /> I Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> City is not practicable, <br /> The Contractor requests the City to inspect and test material or Equipment at the <br /> point of manufacture, or <br /> I <br /> The Standard Specifications or these Special Provisions require that inspection, <br /> testing or witnessing of tests take place at the point of manufacture. <br /> I <br /> Watermain Replacement "T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> IWO No—UP3684 SP—77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.