Laserfiche WebLink
225.2 99% Plans and Specifications <br /> Further develop the final design plans and specifications to the 99%completion level based on the <br /> 90% plans/specifications and modifications from the City's review of the 90% plans/specifications. <br /> Submit plans and specifications to the City for review and comment. The 99% plans and <br /> specifications will provide the City the opportunity to review the materials prior to advertising the <br /> project for bidding. <br /> 225.3 100% Bid-Ready Plans and Specifications <br /> Further develop the final design plans and specifications to the 100% completion level based on <br /> modifications from the City's review of the 99% plans/specifications and develop bid-ready <br /> contract documents. Submit stamped and signed bid-ready contract documents to the City. <br /> 225.4 Construction Cost Estimates <br /> Prepare construction cost estimates and include at each submittal milestone (60%, 90%, 99%, and <br /> 100%). The cost estimates will be formatted to reflect the bid items in the bid schedule of the <br /> contract documents. <br /> 225.5 Constructability Reviews <br /> Provide in-house constructability reviews of the improvements and coordinate review comments <br /> with the project team. <br /> Task Deliverables: <br /> • Submission of 60%, 90%, and 99% design packages include: <br /> a. An electronic copy in PDF format of plan sets (full-size 22"x34"), specifications, <br /> and engineer's opinion of probable construction cost (EOPCC); including Word <br /> documents of the specifications and Excel document of the EOPCC. <br /> • Submission of 100% bid document package includes: <br /> a. An electronic copy in PDF format of stamped and signed bid-ready documents <br /> including: full-size (22"x34") plan sets, specifications, and engineer's opinion of <br /> probable construction cost; including Word documents of the specifications and <br /> bidding drawings in AutoCAD. <br /> City Responsibilities: <br /> • Provide City's most recent standard front-end contract documents and general provisions <br /> (boilerplate specifications). <br /> • Review 60%, 90%, and 99% design submittal packages and provide comments to <br /> Murraysmith. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29, 2018 Final Design Page 8 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.docx <br />