My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc 1/16/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Murraysmith Inc 1/16/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:55 AM
Creation date
1/24/2019 9:47:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc
Approval Date
1/16/2019
Council Approval Date
1/9/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658 2
Tracking Number
0001624
Total Compensation
$846,608.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc. 5/4/2021 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Provide a single set of marked-up plans and specifications that contains City review <br /> comments from all reviewers for each submittal. <br /> Assumptions: <br /> • City review duration will be two weeks. <br /> • Technical specifications prepared by Murraysmith will be in CSI format (MasterFormat). <br /> • Final designs will be based on 30% design previously prepared by Murraysmith in <br /> coordination with the City. <br /> • No landscaping design will be required. <br /> • A three month pause in design is anticipated following the 60% design submittal for the <br /> City to complete SEPA. <br /> Task 226 — Bidding Support <br /> Objective: <br /> Assist the City on an as-needed basis during bidding and award of the project. <br /> Activities: <br /> 226.1 Bidder Inquiries and Addenda <br /> Assist the City in responding to bidders' questions and documenting conversations, and prepare <br /> addenda as necessary to clarify the contract documents. <br /> 226.2 Pre-bid Site Meeting <br /> Attend a pre-bid site meeting with the City and provide support to the City in responding to <br /> questions from attendees. <br /> 226.3 Bid Review <br /> Provide supplemental support in reviewing bids, contacting references, verifying qualifications, <br /> and recommending bid award. <br /> Task Deliverables: <br /> • Bid inquiries correspondence log <br /> • Draft addenda as required for the City to distribute to plan holders <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29,2018 Final Design Page 9 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.