Laserfiche WebLink
Task Deliverables <br /> • Agenda and summary of all meetings <br /> • Design review summaries and comment log <br /> City Responsibilities: <br /> • Coordinate with project team, assist with scheduling meetings, and attend meetings <br /> • Review meeting agendas, meeting summaries, and provide comments to Murraysmith <br /> Assumptions <br /> • Up to four meetings/workshops with City Staff will be attended by up to four <br /> Murraysmith team members. <br /> • Coordination other than through meetings will be accomplished up to the hours shown in <br /> the fee estimate <br /> Task 222 — Subconsultant Coordination <br /> Objective: <br /> Coordinate with subconsultants on subconsultant work tasks,which are detailed later in the scope. <br /> Activities: <br /> 222.1 Geotechnical Engineering Coordination <br /> Coordinate with geotechnical engineering subconsultant during design of the improvements. <br /> Review draft and final geotechnical report and provide final to City. <br /> 222.2 Structural Engineering Coordination <br /> Coordinate with structural engineering subconsultant during design of the improvements. <br /> 222.3 Electrical Engineering Coordination <br /> Coordinate with electrical engineering subconsultant during design of the improvements. <br /> 222.4 Corrosion Engineering Coordination <br /> Coordinate with corrosion engineering subconsultant during design of the improvements. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29,2018 Final Design Page 4 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.docx <br />