My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc 1/16/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Murraysmith Inc 1/16/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:55 AM
Creation date
1/24/2019 9:47:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc
Approval Date
1/16/2019
Council Approval Date
1/9/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658 2
Tracking Number
0001624
Total Compensation
$846,608.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc. 5/4/2021 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Deliverables <br /> • Agenda and summary of all meetings <br /> • Design review summaries and comment log <br /> City Responsibilities: <br /> • Coordinate with project team, assist with scheduling meetings, and attend meetings <br /> • Review meeting agendas, meeting summaries, and provide comments to Murraysmith <br /> Assumptions <br /> • Up to four meetings/workshops with City Staff will be attended by up to four <br /> Murraysmith team members. <br /> • Coordination other than through meetings will be accomplished up to the hours shown in <br /> the fee estimate <br /> Task 222 — Subconsultant Coordination <br /> Objective: <br /> Coordinate with subconsultants on subconsultant work tasks,which are detailed later in the scope. <br /> Activities: <br /> 222.1 Geotechnical Engineering Coordination <br /> Coordinate with geotechnical engineering subconsultant during design of the improvements. <br /> Review draft and final geotechnical report and provide final to City. <br /> 222.2 Structural Engineering Coordination <br /> Coordinate with structural engineering subconsultant during design of the improvements. <br /> 222.3 Electrical Engineering Coordination <br /> Coordinate with electrical engineering subconsultant during design of the improvements. <br /> 222.4 Corrosion Engineering Coordination <br /> Coordinate with corrosion engineering subconsultant during design of the improvements. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29,2018 Final Design Page 4 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.