Laserfiche WebLink
222.5 Surveying and Mapping Coordination <br /> Coordinate with surveying subconsultant for survey of the improvements, review draft survey <br /> information, and develop base map suitable for design drawings in accordance with City <br /> standards. <br /> Task Deliverables <br /> • Geotechnical report <br /> • Survey base map in AutoCAD format meeting the current City Design "Survey & CAD <br /> Standards for Civil Projects", and copies of survey notes. <br /> City Responsibilities: <br /> • Field locate water mains, other City utilities and appurtenances prior to site survey. <br /> Assumptions <br /> • None. <br /> Task 223 — Public Outreach Support <br /> Objective: <br /> To assist the City on an as-needed basis to support their public involvement and public information <br /> activities through final design and bidding. <br /> Activities: <br /> 223.1 Open House/Public Meetings <br /> Assist City staff with public meetings by participating in meetings and preparing presentation <br /> materials to convey project information. <br /> 223.2 Mailers and Handouts <br /> Assist City staff with mailers and handouts by providing project information, figures and <br /> supporting graphics. <br /> Task Deliverables <br /> • Project information, figures, presentation material, and supporting graphics <br /> • Drawings and renderings <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29, 2018 Final Design Page 5 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.docx <br />