My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc 1/16/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
Murraysmith Inc 1/16/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:55 AM
Creation date
1/24/2019 9:47:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc
Approval Date
1/16/2019
Council Approval Date
1/9/2019
End Date
12/31/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658 2
Tracking Number
0001624
Total Compensation
$846,608.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc. 5/4/2021 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Responsibilities: <br /> • City will take the lead in scheduling, notifying the public, and conducting public outreach <br /> meetings. <br /> • City will coordinate with Murraysmith, as needed, during the development of mailers, <br /> handouts and presentation material. <br /> • City staff will document and provide information on outreach activities to the team. <br /> Assumptions <br /> • City staff will take the lead role in communicating with the neighboring community and <br /> the general public. Murraysmith will support the City per the tasks above. It is assumed <br /> that one neighborhood public meeting will be held. <br /> • One mailer/hand-out will be developed. <br /> • Up to two figures or renderings will be developed. <br /> Task 224 — Permitting Support <br /> Objective: <br /> To assist the City on an as-needed basis to support the City's permitting related activities through <br /> final design and bidding. <br /> Activities: <br /> 224.1 City Permit Assistance <br /> Prepare supporting graphics and technical information for the City's permitting activities. City <br /> will take the lead in the preparation, submittal, and payment of permit applications. <br /> 224.2 Storm water Analysis Report <br /> Prepare stormwater analysis and design reports in support of the City's permitting activities. <br /> Task Deliverables <br /> • Project information, figures, and supporting graphics as necessary. <br /> • Stormwater report documenting the project design and applicable minimum <br /> requirements (draft and final report) <br /> City Responsibilities: <br /> • Coordinate with project team, assist with scheduling meetings, and attend meetings <br /> • Review meeting agendas, meeting summaries, and provide comments to Murraysmith <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> November 29, 2018 Final Design Page 6 <br /> \\Pdx-file\bd\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Final Design\Nov 2018\Exh Al-Everett Reservoir 2 Rplcmnt Ph2 Scope 2018-11-29.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.