My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3900 RAILWAY AVE WAYPOINT PROPERTIES 2018-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
3900
>
WAYPOINT PROPERTIES
>
3900 RAILWAY AVE WAYPOINT PROPERTIES 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 8:57:02 AM
Creation date
2/13/2019 8:49:40 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
3900
Tenant Name
WAYPOINT PROPERTIES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
use in an area which is designated as an "Urban" environment. The buffer will be <br />eliminated except between the Snohomish River and the parking area. The remaining <br />buffer will be required to be revegetated. <br />Decision <br />The Planning Director approves the Shoreline Substantial Development Perntit. The <br />following conditions will assure compliance with the general and specific regulations of <br />the City of Everett Shoreline Master Program. <br />1. Construction or substantial progress toward construction of the project must be <br />undertaken within 2 years after final approval of the permit, and completed <br />wiihin five years. If the project has not been completed m this time span, the <br />permit will be reviewed by the Planning Department who will do one of <br />following: extend the permit for one year, or termmate the pennit. <br />2. Elevate the floor of the building a minimum of two feet above the base flood <br />elevation and meet all other floodproofing requirements. <br />3. Provide an amount of 2% of the development costs to the Ciry of Everett Parks <br />Department to be used towards public access to the shoreline. <br />4. Develop the proposal in accordance to the attached site plan and as modified by <br />this report. <br />5. Revegetate the shoreline where no activity is proposed. Provide a planting plan <br />ro the Ciry of Everett Planning Department. <br />Paul A. Roberts, Director <br />INFORMATION FOR THE DEVELOPER <br />1. Detailed drawings in accordance with Ciry Design and Construction Standards shall <br />be submitted to the Public Works Department, showing site parking layout, <br />landscaping, utilities, storm drainage, temporary construction erosion control, and <br />all required improvements in the public right-of-way. Public Works Department <br />approval of these drawings is required prior to any permits being issued. All <br />improvements shall be complered and approved warranted before the Occ�pancy <br />Permit is issued/final approval is granted. <br />2. Full standard (hal� street improvements are required to Railway Avenue including <br />but not limired to curb, gutter, sidewalks, street widening and drainage control per <br />City Design Standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.