My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 6. All spoils material must be hauled away from the site. Stockpiling of spoils or <br /> imported materials onsite (on streets) is not permitted. <br /> 7 The Contractor shall submit detailed traffic control plans to the City for review and <br /> approval in accordance with permit conditions, specifications and contract <br /> provisions. Road closures and detours shall only be utilized when necessary and <br /> approved in advance, otherwise the Contractor shall implement traffic control <br /> measures per City Standards - Series 700 and as stipulated by permit conditions. <br /> 8. Parking spaces are normally very limited in most areas of the project and the <br /> construction contractor shall coordinate with the City in resolving parking issues. In <br /> general, residents who rely on on-street or alley parking and are displaced by the <br /> construction, shall be given priority for the nearest available parking location. The <br /> construction contractors employees may be required to park their personal vehicles <br /> away from the residential and business frontages. <br /> 9. Contractor will be required to coordinate with PUD regarding relocation of poles, <br /> such that the defined project schedule (phases and overall completion) are not <br /> adversely affected. <br /> 1-08.5 Time for Completion <br /> Delete all of 1-08.5 and substitute the following: <br /> 1-08.5(1) General <br /> The Contractor shall complete all physical Contract Work within the number of 1 <br /> "working days" stated in the Contract Provisions or as extended by the Engineer in <br /> accordance with Section 1-08.8. Every day will be counted as a "working day" <br /> unless it is a nonworking day or an Engineer determined unworkable day. A <br /> nonworking day is defined as a Saturday, a Sunday, a whole or half day on which <br /> the Contract specifically prohibits Work on the critical path of the Contractor's <br /> approved progress schedule, or one of these holidays: January 1, the third Monday <br /> of January, the third Monday of February, Memorial Day, July 4, Labor Day, <br /> November 11, Thanksgiving Day, the day after Thanksgiving. and Christmas Day. <br /> When any of these holidays fall on a Sunday, the following Monday shall be counted <br /> a nonworking day. When the holiday falls on a Saturday, the preceding Friday shall <br /> be counted a nonworking day. The days between December 25 and January 1 will <br /> be classified ac nonworking days. <br /> An unworkable day is defined as a half or whole day the Engineer declares to be I <br /> unworkable because of weather or conditions caused by the weather that prevents <br /> satisfactory and timely performance of the Work shown on the critical path of the <br /> Contractor's approved progress schedule. Other conditions beyond the control of <br /> the Contractor may qualify for an extension of time in accordance with Section 1- <br /> 08.8, <br /> Contract Time shall begin on the effective date of the Notice to Proceed. The <br /> Contract Documents may specify another starting date for Contract Time, in which <br /> case, Contract Time will begin on the starting date the Contract Documents specify. <br /> Each working day shall be charged to the Contract as it occurs, beginning on the <br /> effective date of the Notice to Proceed, unless otherwise provided in the Contract <br /> Documents, until the Contract Work is physically complete. Each week the Engineer <br /> will provide the Contractor a statement that shows the number of working days: (1) <br /> charged to the Contract the week before; (2) specified for the physical completion <br /> of the Contract; and (3) remaining for the physical completion of the Contract. The <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-120 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.