My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-09.13 Claims Resolution <br /> I Delete all of 1-09.13 and substitute the following: <br /> Prior to seeking claim resolution through litigation, the Contractor shall proceed under <br /> the administrative procedures in Sections 1-04.5 and 1-09.11 and elsewhere in the <br /> I Contract Documents for resolution of disputes. These must be complied with in full, as <br /> a condition precedent, to the Contractor's right to seek claim resolution through litigation. <br /> Supplement Section 1-09 by adding the following: <br /> I 1-09.14 Patents and Royalties <br /> (******) <br /> Should the Contractor, its agent, employee or any of them be enjoined from furnishing or <br /> I using any invention, article, material or plans supplied or required to be supplied or used <br /> under this Contract, Contractor shall promptly pay such royalties and secure requisite <br /> licenses; or, subject to acceptance by City, substitute other articles, materials, or appliances <br /> 1 in lieu thereof that are of equal efficiency, quality, finish, suitability and market value to those <br /> planned or required under the Contract. Descriptive information of these substitutions shall <br /> be submitted to the City's Representative for determination of general conformance to the <br /> I design concept and the construction Contract. Should City elect to refuse the substitution, <br /> Contractor agrees to pay such royalties and secure such valid licenses as may be requisite <br /> for the City, its officers, agents and employees or any of them, to use such invention, article, <br /> material or appliance without being disturbed or in any way interfered with by any proceeding <br /> I in law or equity on account thereof. <br /> Costs involved in fees, royalties, or claims for any patented invention, article, process or <br /> method that may be used upon or in a manner connected with the Work under this Contract <br /> or with use of completed Work by the City shall be paid by the Contractor. The Contractor <br /> I and its sureties shall protect and hold the City, and City's Representative, together with its <br /> officers, agents, and employees, harmless from any and all loss, defense cost; and expenses <br /> I and against any and all demands made for such fees or claims brought or made by the holder <br /> of any invention or patent. Before final payment is made on the account of this Contract, the <br /> Contractor shall, if requested by the Owner, furnish acceptable proof of a proper release from <br /> all such fees or claims. <br /> 1 1-10 TEMPORARY TRAFFIC CONTROL <br /> 1-10.1 General <br /> I1-10.1(2) Description <br /> Supplement 1-10.1(2) as follows: <br /> Provide a uniformed off-duty Police Officer to control traffic for work at signalized <br /> Iintersections and other critical situations as determined by the Engineer. <br /> 1-10.2 Traffic Control Management <br /> I 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> I supervisors by one of the organizations listed below: <br /> Evergreen Safety Council (800) 521-0778 <br /> Northwest Laborers Union (800) 240-9112 <br /> I American Traffic Safety Services Association (877) 642-4637 <br /> 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> 1 WO No. UP3398 SP -147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.