My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 <br /> Contractor may use City's Standard Traffic Control Plans included in COE Standard <br /> Drawings, Series 700. The City does not represent or warrant that the Standard <br /> Plans are sufficient. adequate or complete for the Contractor's means, methods or <br /> plan of Work. If a new or additional Traffic Control Plan is necessary, prepare <br /> detailed Traffic Control Plan complying with COE Standard Drawings, Series 700, <br /> the MUTCD, Part 6, and the most current edition of the PROWAG (Public Rights- <br /> of-Way Accessibility Guidelines). Plan preparation shall be at Contractor's sole cost <br /> and submitted to the City for approval at least 14 calendar days before starting <br /> Work. Work may not begin until Contractor is in receipt of City approved Traffic <br /> Control Plan, <br /> 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: I <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> 1-10.3(1) General <br /> The Contractor shall provide all flaggers, signs and other traffic control devices. The <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> from injury or damage as a result of the Contractor's operations that may occur on <br /> highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> all necessary signs and traffic control devices are in place. <br /> Flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington, Oregon, or Idaho. The flagging card shall be immediately available and <br /> shown upon request by the City. I� <br /> 1-10.3(2) Maintenance and Protection of Traffic Control <br /> When the Bid proposed includes an item for "Maintenance and Protection of Traffic <br /> Control," the Work required for this item shall be to: I <br /> 1. Furnish and maintain signs, cones, barricades, flasher, and other <br /> channelization devices; <br /> 2. Provide supervisory personnel for all labor for traffic control; <br /> 3. Provide labor and necessary vehicle(s) for set-up and removal of construction <br /> signs and the traffic <br /> ra IC171trol devices that are placed daily; <br /> y, <br /> 4. Provide labor and vehicles for patrolling and maintaining in position all of the <br /> construction signs and the traffic control devices; <br /> 5. Provide labor, material, and equipment necessary for cleaning up, removing <br /> and replacing all construction signs and traffic control devices that are <br /> destroyed, damaged or lost during the life of the project; <br /> 6. Provide flagging or use of police officers for the convenience of the <br /> Contractor, such as facilitating movement of equipment on the site, laying out <br /> or relocating traffic control devices and signs. <br /> 7. Cost associated with preparation and distribution of public notices involving <br /> parking, street access or traffic issues. 1 <br /> Upon failure of the Contractor to immediately provide flaggers, erect, maintain, and <br /> remove signs; or provide, erect, maintain, and remove other traffic control devices when <br /> ordered to do so by the Engineer, the City may without further notice to the Contractor <br /> or the Surety, perform any of the above and deduct all or the costs from the Contractor's <br /> payments. <br /> Cleveland Avenue Division 1 —GENERAL REQUIREMENTS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -148 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.