My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Core drill for pipe connections less than 28-inch O.D. Line drill or wall saw an <br /> opening for pipe connection greater than 28-inch O.D.to accommodate the size of <br /> pipe to be inserted. Interconnect drilled holes where line drilling is the method used. <br /> Use a small core drill to accomplish line drilling. Jackhammer or rotary hammer shall <br /> not be used. For line drilling provide minimum 1-inch and maximum 2-inch <br /> clearance around the circumference of the pipe. Core drill opening to accept a <br /> watertight flexible pipe to manhole connection in accordance with manufacturer's <br /> recommendations. Place upstream pipes, except PVC and HDPE pipe, penetrating <br /> the manhole walls with the bell facing out and snug against the outside wall of the <br /> structure as the angle of penetration allows. Provide a flexible joint within 1/2 of a <br /> pipe diameter or 12-inches, whichever is greater for pipe, except PVC and HDPE <br /> pipe, leaving or entering manholes. <br /> Place pipes entering or leaving the manhole on firmly compacted bedding. Take <br /> particular care in compacting bedding within the area of the manhole excavation <br /> that is normally deeper than the sewer trench. Take special care to ensure the <br /> annual opening around each pipe entering the manhole is completely and firmly <br /> rammed full of non-shrink grout to ensure water tightness. Non-shrink grout shall <br /> conform to requirements of 9-03.20.3(2) of the Standard Specifications. <br /> Provide a watertight flexible pipe to manhole connector for pipe diameters less than <br /> or equal to 24-inches for PVC or HDPE pipes connecting to manhole. Place no PVC <br /> or HDPE pipe joint within 10-feet of the outside face of the manhole. <br /> 7-05.3(4) Drop Manhole Connections <br /> Delete the first paragraph in 7-05.3(4) and substitute the following: <br /> Construct outside drop connections where shown on Plans in accordance with <br /> these Special Provisions and 7-04, 7-05, and 7-17 of the Standard Specifications <br /> and COE Standard Drawing No. 608. <br /> Construct inside drop connections where shown on the Plans, or as approved by <br /> Engineer, in 54-inch diameter manholes or larger in accordance with these Special <br /> Provisions and 7-04, 7-05, and 7-17 of the Standard Specifications and COE <br /> Standard Drawing No. 609. <br /> Provide factory installed holes for drop connections for new manholes and core drill <br /> holes for existing manholes. Impact tools shall not be allowed for making holes in <br /> manhole walls. <br /> Supplement 7-05.3 by adding the following: I <br /> 7-05.3(5) Furnish and Install Solid Lid for Catch Basins <br /> (******) <br /> Provide new solid lids on existing catch basins where shown on the Plans. Provide <br /> solid lids conforming to 9-05.15 of the Standard Specifications, 9-05.15(1) of these <br /> Special Provisions, and to COE Standard Drawing No. 405 and 406B for Type A. <br /> and B Catch Basins and COE Standard Drawing 607 for Type 2 Catch Basins. <br /> 7-05.4 Measurement <br /> Delete all paragraphs of 7-05.4 and substitute the following: , <br /> Cleveland Avenue Division 7—DRAINAGE STRUCTURES, November 2018 <br /> Sewer System Replacement and STORM SEWERS,SANITARY SEWERS, <br /> Storm Water Separation WATER MAINS,AND CONDUITS <br /> Work Order No. UP3398 SP-172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.