Laserfiche WebLink
I <br /> The cost of cleanup by vacuum collection and disposal of the cuttings slurry is considered <br /> incidental to this bid item. <br /> Measurement for sawcutting will be per linear foot along the true length of the surface cut. <br /> Bid Items A-9 and B-9 - ROADWAY EXCAVATION, INCLUDING HAUL <br /> Specification Section 2-03 <br /> ' Measurement and Payment: Unit Price per Square Yard <br /> The unit price per square yard for roadway excavation shall be full compensation for all labor, <br /> compaction, material, incidentals, tools, and equipment necessary to remove asphalt concrete <br /> pavement, cement concrete, curbs and sidewalks that is not otherwise removed by trenching for <br /> pipes or manholes and where specifically indicated on the plans and as directed by the City. <br /> Also, incidental to this Bid item is excavation and removal any aggregate base material, or soils <br /> necessary to reach design elevations for subgrade of restoration paving. <br /> Also to be included in this Bid item shall be the cost of excavating, hauling, and disposing of the <br /> existing pavement and base material. <br /> All materials and items of work required by the Plans, Standard Specifications, Standard <br /> Provisions, or otherwise necessary for complete asphalt concrete pavement replacement that <br /> are not specifically listed among the bid items in the proposal shall be considered incidental to <br /> the listed bid items. No further payment will be made. <br /> There will be no separate payment for haul on any material moved within or disposed offsite <br /> from the project site and the Contractor shall include the cost of hauling in this Bid item. <br /> ' Compaction of native material will be considered incidental to the unit contract price of other bid <br /> items related to placement of base course or paving materials. Compaction of import material <br /> will be considered incidental to the unit price per ton of import material. <br /> Measurement for roadway excavation will be based on the surface area measured in square <br /> yards. <br /> If discrepancies are discovered in the ground elevations which will materially affect the <br /> quantities of earthwork, the original computations of earthwork quantities will be adjusted <br /> accordingly. <br /> Bid Items A-10 and B-10 - GRAVEL BORROW, INCLUDING HAUL <br /> ' Specification Section 2-03 <br /> Measurement and Payment: Unit Price per Ton <br /> The unit price per ton for gravel borrow shall be full compensation for all labor, material, <br /> incidentals, tools and equipment necessary to furnish imported gravel borrow per Special <br /> Cleveland Avenue Division B-BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP -33 <br />