I <br /> 1 <br /> Provisions Section 9-03 or bank run per Standard Specifications Section 9-03.19 for trench <br /> backfill and other work as required, from a Contractor-supplied source in accordance with 111Section 2-03.3(14)J of the Standard Specifications and these Special Provisions. Recycled <br /> concrete can be used in lieu of gravel borrow for trench backfill above the pipe zone and up to 3 <br /> feet below ground surface subject to approval on the source/supplier in advance by the <br /> Engineer. Moisture content of material during placement and compaction shall not exceed 3% <br /> above optimum moisture content of maximum dry density as determined by section 2-03.3(14)D <br /> of the standard specification. Only solo dump trucks may be used in the area of the project. <br /> The unit price for gravel borrow shall also include all costs for furnishing, hauling, stockpiling, <br /> 9 9 <br /> moisture control measures, placing, grading and compacting the material in place. Materials <br /> may not be stockpiled on the project site. ' <br /> Measurement for gravel borrow shall be by the ton, recorded on certified weight tickets per <br /> Section 1-09.1 for Gravel Borrow placed within limits of dimensions defined in the Work, <br /> descriptions for other bid items, shown on the Plans, details or COE Standard Drawings, or as <br /> otherwise approved by the Engineer. <br /> Payment forgravel borrow will be bythe ton. <br /> Y <br /> Bid Items A-11 and B-11 — FOUNDATION MATERIAL <br /> Specification Section 2-03 <br /> Measurement and Payment: Unit Price per Ton I <br /> The unit price bid per ton for foundation material, Class A, B or as approved by the Engineer, <br /> shall constitute full compensation for all labor, materials and equipment required to furnish, <br /> place, and compact foundation material as specified in the Standard Specifications, the Special <br /> Provisions and as shown on the Contract Plans. <br /> The unit price of this bid item includes all costs for dewatering and over-excavation, removal <br /> and disposal of unsuitable subgrade material below the pipe zone or roadway subgrade. <br /> Measurement for foundation material shall be by the ton, recorded on certified weight tickets per <br /> Section 1-09.1 for Foundation Material placed within the limits of dimensions defined in the <br /> Work, descriptions for other Bid Items, shown on the Plans, details or COE Standard Drawings, <br /> or as otherwise approved by the Engineer. <br /> Payment for foundation material, Class A, B or as approved by the Engineer will be by the ton. I <br /> Bid Items A-12 and B-12 — STREET CLEANING AND SWEEPING <br /> Specification Section 2-08 <br /> Measurement and Payment: Unit Price per Hour <br /> I <br /> Cleveland Avenue Division B--BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-34 1 <br />