My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Included in the lump sum price for this bid item are all costs for temporary erosion control <br /> measures that may be required at all staging areas, material and equipment storage yards and <br /> I <br /> other sites occupied or used by the Contractor. <br /> Measurement for temporary sedimentation and erosion control shall be the ratio of the number <br /> of working days completed to the total number of working days authorized in the Contract. <br /> Bid Items A-30 and B-40 —TOP SOIL, TYPE A I <br /> Specification Section 8-02 <br /> Measurement and Payment: Unit price per Cubic Yard <br /> The unit price per cubic yard for Top Soil, Type A shall be full compensation for all labor, <br /> equipment, materials and incidentals to provide and install top soil where indicated on the plans <br /> and in accordance with Section 8-02.3(4) and section 9-14.1 of the specifications and special <br /> provisions <br /> Bid Item B-44—SOD INSTALLATION <br /> Specification Section 8-02 <br /> Measurement and Payment: Unit price per Square Yard , <br /> The unit price per square yard for Sod Installation shall be full compensation for all labor, <br /> equipment, materials and incidentals to provide, install, and establish sod lawn where indicated <br /> on the plans and in accordance with Section 8-02.3(16) of the specifications <br /> Bid Items A-31 and B-42 — CEMENT CONCRETE CURB AND GUTTER, TYPE A-1 ' <br /> Specification Section 8-04 <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price bid per linear foot of Concrete Curb and Gutter, Type A-1 shall be full <br /> compensation for all labor, equipment, materials and incidentals, including forms, necessary to <br /> perform the work and shall include the replacement of concrete curbs or curb and gutter <br /> impacted by construction activities and curb ramp installation in accordance with the COE <br /> Standard Drawings and these Special Provisions. <br /> The cost of sawcutting, removing and disposing of concrete curb and gutter, subgrade <br /> preparation and placement and compaction of crushed rock base is incidental and shall be <br /> included in the unit price for this bid item. Installation of curb depressions for driveway cuts and <br /> wheelchair ramps shall be incidental to these items and no separate payment will be made. <br /> Measurement shall be per linear foot as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.