My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid Items A-32 and B-43 — CEMENT CONCRETE SIDEWALK, DRIVEWAY AND ALLEY <br /> ' APPROACH, 6-INCH THICKNESS <br /> Specification Section 8-06 <br /> Measurement and Payment: Unit Price per Square Yard <br /> ' The unit price per square yard of Cement Concrete Sidewalk, Driveway and Alley Approach, 6- <br /> Inch Thick shall be full compensation for replacement or installation of concrete sidewalk, <br /> driveway or alley approach impacted by construction activities and/or shown on the Contract <br /> Plans in accordance with the COE Standard Drawings and these Special Provisions. <br /> ' The cost of sawcutting, removing and disposing of sidewalk and driveways is included in <br /> Roadway Excavation Bid Item. <br /> ' Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> ' Deductions will be made for blocked out areas, castings, or other discontinuities in the sidewalk <br /> 9 square feet or larger. <br /> ' Measurements for"Gravel Borrow" to be used as fill for sidewalk subgrade will be by the ton as <br /> recorded on certified weight tickets per Section 1-09.1 and is included in Gravel Borrow Bid <br /> Item. <br /> Measurement for "Crushed Surfacing Top Course" to be used under this Bid item will be by the <br /> ' ton as recorded on certified weight tickets per Section 1-09.1 and is included in Crushed <br /> Surfacing Top Course Bid Item. <br /> ' The unit contract price for this Bid item shall include all costs for the work required to construct <br /> the sidewalk as specified, including the earth work required to excavate excess material or <br /> place fill to achieve design subgrade elevations. <br /> Bid Item B-44— SURVEY MONUMENTS <br /> Specification Section 8-13 <br /> ' Measurement and Payment: Unit Price per Each <br /> The unit price per each for Survey Monument shall be full compensation for furnishing and <br /> ' placing the survey monument and monument case and cover, in accordance with the COE <br /> Standard Drawings and Standard Specifications, Special Provisions Section 8-13, in conformity <br /> with the lines and locations shown on the Plans. Also included is processing all necessary forms <br /> with Washington DNR. <br /> Measurement shall be each survey monument replaced and reset including case and cover <br /> ' furnished and set and adjusted to grade. <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.