Interwest Construction Inc 2/8/2019
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 2/8/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:19 AM
Creation date
2/14/2019 10:22:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
2/8/2019
Council Approval Date
1/18/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Tracking Number
0001631
Total Compensation
$6,016,496.54
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Payment for this bid item shall be made in accordance with Section 1-09.1. <br /> Bid Items A-33 and B-45— CEMENT CONCRETE SIDEWALK, 4-INCH THICKNESS <br /> Specification Section 8-14 <br /> Measurement and Payment: Unit Price per Square Yard <br /> The unit price per square yard of Cement Concrete Sidewalk, 4-Inch shall be full compensation <br /> for replacement or installation of concrete sidewalk, driveway or alley approach impacted by <br /> construction activities and/or shown on the Contract Plans in accordance with the COE <br /> Standard Drawings and these Special Provisions. <br /> The cost of sawcutting, removing and disposing of sidewalk and driveways is included in <br /> Roadway Excavation Bid Item. <br /> 1 <br /> Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> Deductions will be made for blocked out areas, castings, or other discontinuities in the sidewalk <br /> 9 square feet or larger. <br /> Measurements for"Gravel Borrow" to be used as fill for sidewalk subgrade will be by the ton as <br /> recorded on certified weight tickets per Section 1-09.1 and is included in Gravel Borrow Bid <br /> Item. <br /> Measurement for"Crushed Surfacing Top Course" to be used under this Bid item will be by the <br /> ton as recorded on certified weight tickets per Section 1-09.1 and is included in Crushed <br /> Surfacing Top Course Bid Item. <br /> The unit contract price for this Bid item shall include all costs for the work required to construct <br /> the sidewalk as specified, including the earth work required to excavate excess material or <br /> place fill to achieve design subgrade elevations. ' <br /> Bid Item B-46 — CONCRETE CURB RAMP TYPE A OR B <br /> Bid Item B-47 — CONCRETE CURB RAMP TYPE C OR D <br /> Specification Section 8-14 <br /> Measurement and Payment: Unit Price per Each <br /> The Contractor Price per each for construction of Concrete Curb Ramp Type A or B and <br /> Concrete Curb Ramp Type C or D, per COE Standard Drawings and these Special Provisions <br /> at the locations indicated on the Plans and as directed by the Engineer shall be full <br /> compensation in accordance with the COE Standard Drawings and these Special Provisions. <br /> Also included in this Bid item shall be the cost of removing existing curb and sidewalk where it is <br /> not otherwise removed by other Work. <br /> Cleveland Avenue Division B—BID ITEM DESCRIPTIONS November 2018 <br /> Sewer System Replacement and <br /> Storm Water Separation <br /> WO No. UP3398 SP-48 <br />