Laserfiche WebLink
Draft 7/27/2018 15 1 <br /> Allocation to the Subarea of between 10,000 and 15,000 additional employees would <br /> require the construction of transportation improvements to increase the capacity at the <br /> screenlines.The construction of additional capacity on SR 526 would probably provide <br /> the best accommodation for significant employment increases(up to 15,000)in the SW <br /> Everett/Paine Field Subarea. <br /> • <br /> • <br /> • <br /> • <br /> c:\users\campk\documents\opened fram_outlooklattachment c(methodology).doc <br /> 111 <br />