My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/02/27 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/02/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 9:30:03 AM
Creation date
2/28/2019 9:29:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> FINAL <br /> ADDENDUM NO. 19 TO THE <br /> • 1991 BOEING EVERETT MITIGATION <br /> DECISION DOCUMENT <br /> SEPA#17-009 <br /> • <br /> APPLICANT: The Boeing Company <br /> Attn:Todd Haberlack <br /> P.O. Box 3707 MS: OH-13 <br /> Seattle,WA 98124-2207 <br /> PROJECT LOCATION: 3003 W Casino Rd. <br /> Everett,WA 98204 <br /> Lead Agency: Community, Planning and Economic Development <br /> City Contact: Teresa Weldon Phone: (425)257-8731 - <br /> DESCRIPTION OF THE PROPOSED ACTION: <br /> The proposed action is an amendment to the Decision Document to eliminate the cap of 21,000 <br /> on-site parking stalls and the cap of 35,000 employees at the Everett Boeing main site in <br /> exchange for the implementation of a direct vehicle traffic counting system called the "Direct <br /> Count Program". The City of Everett and Boeing will jointly participate in this program to <br /> provide direct counting of vehicle traffic at all entrances to Everett Boeing's Main Site and <br /> Flightline. <br /> The data generated will be compared with baseline data from the 1991 Master Plan EIS to <br /> evaluate actual trip generation.To date, Boeing has paid for 12,315 PM Hour Peak Trips. For <br /> each new PM Peak Hour Trip above the approved baseline traffic volume, Boeing shall pay a <br /> traffic mitigation fee calculated in accordance with the traffic mitigation ordinance in effect for <br /> the Boeing Everett site at the time of calculation. Upon payment of this traffic mitigation fee, a <br /> new baseline traffic volume shall be set equal to the sum of the old baseline traffic volume and <br /> the newly mitigation PM Peak Hour Trips. By implementation of this program,the future <br /> observed annual traffic counts will be the determining factor in whether traffic mitigation fees <br /> shall be due. <br /> As an example, for PM Peak Hour Trips above 12,315, Boeing would pay$1,006 per new PM <br /> Peak Trip per the SW Everett Subarea Plan, or pay the current traffic mitigation fee(currently <br /> $2,400 per new PM Peak Trip or as adjusted per inflation) if the SW Everett Subarea Plan has <br /> been retired or revised. <br /> BACKGROUND: <br /> 69 2930 Wetmore Avenue,Suite 8-A,Everett,WA1 18201-4044 TR (425)257-8731,Fax(425)257-8742 <br />
The URL can be used to link to this page
Your browser does not support the video tag.