Laserfiche WebLink
MEMORANDUM <br />Date: March 31, 1994 <br />NIPRIHIHSn <br />To: Jeff McFall <br />NP[NI1E[IURE <br />City of Everett <br />OESI6H <br />3200 Cedar Street <br />Everett, WA 98201 <br />siRnius. IN[ <br />From: Craig Hanway <br />Comprehensive Architecture & Design Services, Inc. <br />303 West Blaine Street <br />Seattle, WA 98119 <br />Re: Everett Clinic Tenant Space <br />First Interstate Bank Rucker Building <br />4205 Rucker Avenue <br />303 Les, <br />Plan Check #EB-43780 <br />H1a;u $l <br />Attached are two corrected sets of Construction Documents for the above <br />project, showing revisions in response to your review comments, dated <br />March 23, 1994. 1 have summarized the actions taken & corrections made <br />to the drawings below. My responses are Itemized to refer to your <br />comments, in numerical order. <br />1. 1 have added my architect's registration and signiture to each <br />WBgH19 sheet of the documents. <br />2. The layout of the Conference/Break Room on sheet A-1 has <br />been changed so the exits are separated by more than half <br />the maximum diagonal dimension of the space. <br />3. 1 have changed the swing on doors #22 & #27 on sheet A-2 <br />to swing in the direction of travel toward the exit corridor. <br />12H) Also, the doors out of the Conference/Break Room on sheet <br />H2 alai A-1 now conform to this requirement. <br />4. 1 am proposing that the existing deluge sprinkler heads <br />located at the stair landings be maintained to provide <br />separation between the existing stair and the elevator lobby <br />spaces. I have shown these on the Reflected Ceiling Plans <br />on Sheets A-3 & AA. <br />All doors opening onto an exit corridor are either a new or <br />a Pian <br />!iR <br />existing 20 minute assembly. I have made notations to the <br />1 1 P1Door Schedule to clarify where existing doors affected by the <br />C 5 15�� <br />............... . <br />CITY OF EVERETT <br />Bldg. Permit Counter <br />