My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/04/03 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/04/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2019 10:50:57 AM
Creation date
4/9/2019 10:49:52 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V3 <br /> 4. Coordinate review of supplier deliverables <br /> 2.5 MEETINGS <br /> The Supplier must attend a variety of meetings that fall into the following categories: <br /> A. Scoping Meeting(s) <br /> B. Kick-off meeting with Project Staff <br /> ■ Gather requirements and confirm understanding of the project timeline, <br /> approach and deliverables <br /> C. Interim Meetings <br /> • Monthly status updates (in person or by teleconference) <br /> D. Council Presentation(s). <br /> 2.6 BUILDING DESCRIPTIONS <br /> Building locations and descriptions are provided in Appendix A. <br /> 2.7 EXPECTED DELIVERABLES <br /> 1. The contracted supplier must provide a report for each building which includes the <br /> following minimum elements: <br /> • Digital format that is exportable to a computerized maintenance management <br /> system. <br /> • Summary of investigator's experience, training, and certifications. <br /> • Description of examination methods used <br /> • Recommended areas for additional study to corroborate and confirm findings <br /> • Description of the examination including location, quantities, materials and <br /> systems that are installed. <br /> • Summary of estimated age, condition and serviceability of materials and <br /> systems examined. <br /> • Recommended renovations or repairs and their cost in the year the expenditure <br /> will be required, in priority order. <br /> • Estimated remaining life of renovation or repair once completed. <br /> • Photographs, site plans, maps, etc. <br /> 2. Prepare a plan to strategically reduce the backlog of deferred capital and <br /> maintenance projects. <br /> 2.8 KEY EMPLOYEES <br /> The Contractor shall not, absent prior written notice to, and written consent by, the City of <br /> Everett remove or reassign any of the key management personnel identified in its <br /> Proposal at any time prior to or after execution of the contract <br /> 2,9 PAYMENT <br /> Within 30 days after delivery, acceptance of items ordered and a properly prepared <br /> invoice but not more often than once per month the City of Everett will pay the Supplier <br /> according to the rate(s) stated on the price sheet. <br /> O <br /> 0 <br /> 143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.