Laserfiche WebLink
31. Please verify if shear forces delivered from wood shear walls along the south elevation, and <br /> shown on details 1/S101 and 2/S101 stops at CMU only or does the load path continue to <br /> transfer into the existing concrete wall. <br /> 32. On 1/S100, it appears that new hold downs are being added at the ends of shear walls. <br /> Please provide calculations showing holddown forces are resolving into the slab and <br /> thickened footing. Provide calculations per Chapter 17 of the ACI 318-14. <br /> If you have any questions, please email or call me at (425) 257-8976. Upon submittal of the <br /> drawings, your application will be given priority and plan reviews will recommence. All required <br /> submittals shall be sufficient detail and contain sufficient information to ensure that the proposed <br /> structure will be constructed in compliance with all adopted codes. <br /> Please prepare a response letter showing where each item in this correction <br /> letter is addressed on the plan set. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> City of Everett Public Works Department <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 I Direct: 425-257-8976 <br /> Email: JHei/mantaeverettwa.gov <br /> .-� <br /> PLINUC WORKS <br /> The Permit Services Counter is located on the 2nd Floor. <br /> Hours of Operation: Monday-Friday 7:30am -12:00pm and 1:OOpm-4:OOpm. <br /> All emails, and attachments, sent to and from City of Everett are Public <br /> Records and may be subject to public disclosure pursuant to RCW 42.56. <br /> Page 4 of 4 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax (425) 257-88 <br />