Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> This Work consists of constructing manholes, inlets, drywells, and catch basins and <br /> connecting to existing Structures of the types and sizes designated in accordance with <br /> the Plans, these Special Provisions, the Specifications, and the COE Standard <br /> Drawings, in conformity with the lines and grades staked. <br /> Further Supplement 7-05.1(1) as follows: <br /> 7-05.1(1) Submittals <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide shop drawings for all type 2 catch basins for engineer review and approval. <br /> 7-05.2 Materials <br /> Supplement 7-05.2 by adding the following at the end of the material list: <br /> Mortar, nonshrink 9-20.3(2) Standard Specifications <br /> Commercial Concrete 6-02.3(2)B Standard Specifications <br /> Watertight Connection Boots 9-04.12 Special Provisions <br /> Flexible Couplings 9-04.13 Special Provisions <br /> Polypropylene Manhole Steps 9-05.64 Special Provisions <br /> & Hand Holds <br /> Polypropylene Manhole Ladder 9-05.66 Special Provisions <br /> 7-05.3 Construction Requirements <br /> Supplement 7-05.3 by adding the following after the last sentence of the third paragraph: <br /> Install PAMREX, East Jordan Iron Works, or equal, hinged manhole frame and cover in <br /> accordance with manufacturer recommendations and applicable City standards and <br /> I details. <br /> Coordinate manhole cover and frame hinge location with manhole steps and traffic <br /> lanes. Hinge orientation to be determined during the shop drawing review of precast <br /> manhole structures. <br /> Delete the tenth paragraph in 7-05.3. <br /> Revise the last sentence in the sixteenth paragraph in 7-05.3 to read as follows: <br /> Provide manholes, inlets, and catch basins that upon final acceptance of the Work <br /> conforms to the following COE Standard Drawings requirements: <br /> 1. Manholes No. 605, 606 and 607 as applicable. <br /> 2. Inlets No. 401 <br /> 3. Catch Basins No. 402, 403 and 405 as applicable. <br /> 7-05.3(1) Adjusting Manholes and Catch Basins to Grade <br /> Delete both paragraphs of 7-05.3(1) and substitute the following: <br /> Adjust manholes, catch basins and other structures to final grade after completing <br /> pavement operations. Carefully re-establish the center of each structure from <br /> Contractor's previously established references. <br /> Cut pavement in neat circle having a minimum diameter of 2-feet beyond the <br /> casting cover. Remove pavement and base material, maintaining the neat circle, <br /> to permit casting and frame removal. Adjust casting and frame to proper grade. <br /> Place cast iron frame on concrete blocks or concrete adjusting rings and wedge <br /> up to the desired grade using plastic wedges. Wood or metal wedges are not <br /> allowed. The backfill around finished casting frame to within 1-1/2 inches of <br /> finished pavement surface using commercial concrete. <br /> After concrete has set a full 24-hours, paint the edges of the asphalt concrete <br /> pavement and the outer edge of the casting with hot asphalt cement. Place hot <br /> I Alverson Stormwater Separation February, 2019 <br /> WO No. -UP3660 Division 7—STORM, SEWER,WATER <br /> SP-155 <br />