My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
>
Address Records
>
EVERGREEN WAY
>
6502
>
ENHANCED SERVICE FACILITIES
>
6502 EVERGREEN WAY ENHANCED SERVICE FACILITIES 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 9:13:55 AM
Creation date
5/29/2019 3:24:21 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6502
Tenant Name
ENHANCED SERVICE FACILITIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br /> 3. MR #5:0n-Site Stormwater Management -must be addressed for the <br /> project using either the performance standard or the list method. If the list <br /> method is chosen document the feasibility/ infeasibility determination for the <br /> progression through the list. Specific infeasibility criteria must be cited. Note <br /> that if infeasibility is based on infiltration rate or potential, a PIT test will be <br /> required to document the infiltration rate. It appears that perched <br /> groundwater and/or impermeable layers may make some on-site BMPs <br /> infeasible. <br /> Storm water management is now handled with a detention system, report <br /> updated. Soils information also provided to support the use of non LID <br /> method due to lack of infiltration onsite. <br /> 4. MR#6: Water Quality Treatment -must be provided in accordance with <br /> the manual. Per Sep 5 of Section 2.1, Volume V of the Manual the project <br /> will be required to provide enhanced treatment as it is considered a <br /> commercial project. <br /> Two Filterra Units are proposed to treat runoff. See calculations provided by <br /> Contech for sizing. <br /> 5. If MR #7: Flow Control -is applied to replaced surfacing as well as new <br /> the site will need to provide stormwater flow control in accordance with <br /> Volume III of the Manual. The pre-developed conditions will be forested for <br /> all replaced pavement, rather than existing conditions. <br /> Chambermaxx detention system is proposed with a 54"control structure <br /> sized by WWHM2O12. See calculations for sizing. <br /> 6. Please provide the O&M manual as a standalone document (can also be <br /> included in the stormwater report for convenience.) Please include the <br /> following information on the cover page or other prominent location within <br /> the document: <br /> the party responsible for maintenance and operation, <br /> • the requirement for the O&M Manual to be retained on or within <br /> reasonable access to the site, <br /> the requirement to transfer the Manual to any new property owner <br /> along with the property, and <br /> • the requirement that a log of maintenance activity be kept and <br /> made available for inspection by the City upon request that indicates <br /> what M&O actions were taken shall be kept. <br /> O&M manual updated to current Everett Manual and provided as <br /> separate document. <br /> 7. Section 2 of the Storm Drainage Report notes that the NRCS classifies <br /> Alderwood soils as Class B. However, the Manual classifies Alderwood soils <br /> as a Class C soil (Volume III, Table 2.3.1). In the City's experience the soils <br /> in this area behave more like a Class C soil, Calculations for the site should <br /> be based on Class C or Till soil types. <br /> Soils information corrected. Soils report provided in appendix B. <br /> 8. The Offsite Analysis section of the report shall address run-on from the <br /> adjacent property. If runoff from areas outside the site flow to the treatment <br /> facilities., they must be included in the treatment calculations. <br /> Offsite analysis is updated in Section 3 to include Fleming and the onsite <br /> system along with the offsite runoff being bypassed. <br /> P:\2016\16153 ESF&Retail everett\P&E\Text\Correspondence\Everett 1st revlewrdo - <br /> (� <br />
The URL can be used to link to this page
Your browser does not support the video tag.