My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
>
Address Records
>
SEAWAY BLVD
>
3301
>
WHOLE SITE
>
3301 SEAWAY BLVD WHOLE SITE 2025-10-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 8:09:23 AM
Creation date
6/4/2019 9:20:56 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Sabrina Fandler <br />City of Everett <br />Public Works Department <br />Engineering/Permit Services -3-/ June 23, 2016 <br />2. The comments below were generated from this project's Stormwater Reviewer. If you have <br />any questions regarding these comments, please contact Jane Zimmerman with the City of <br />Everett Public Works Department (425-257-8885 orJZimmerman@everettwa.gov). <br />a. General stormwater requirements as detailed in the City's 2010 SWMM — the applicant <br />must show that all applicable requirements are being met. <br />i. Access road requirements per Chapter 2.2 of Volume 111 <br />Response: The pond access road is shown per the requirements of Chapter 2.2 of <br />Volume III and a detail has been added to the plans. <br />ii. Pond berm and embankment material and construction specifications as provided by <br />a geotechnical engineer, see standards in Chapter 2.3 of Volume 111 for minimum <br />requirements <br />Response: Comment acknowledged. A note has been added to the plans for a <br />geotechnical engineer to observe pond berm construction. <br />iii. Liner requirements per a geotechnical engineer's material and construction <br />specifications, must include provisions for protection/identification for maintenance <br />activities in the bottom of the pond <br />Response: A note has been added to the pond sections to line the pond with a <br />flexible membrane liner (FML) per geotechnical engineer recommendations. <br />iv. Pond fencing in accordance with Chapter 2.5 of Volume 111 <br />Response: Pond fencing is now shown and called out in plan and profile views. <br />v. Overflow requirements per Chapter 2.9, Volume 111 and the calculations necessary to <br />show the standards are being met. A secondary inlet to the flow control structure <br />must be provided in accordance with Chapter 2.9 and the primary overflows to the <br />two drainage basins must be proportioned in the same way as the design release <br />rates. In addition, due to the height of the pond berm on the east side, an emergency <br />spillway will be required. The location and design of the emergency spillway must be <br />specifically reviewed and approved by the project's geotechnical engineer. <br />Response: Comment acknowledged. Overflows are now shown per city <br />requirements and calculations have been added to the storm drainage report. <br />b. More specific plan/report comments: <br />i. A minimum of 6" of sediment storage must be provided in the bottom of the pond <br />Response: The pond has been revised to provide 1-foot of sediment storage. <br />ii. The grading for the pond must stay outside of the NGPE and all pond contour lines <br />must close on the buildable area of the site, outside of the NGPE line. The proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.